Temporary works coordination in Manchester
An independent Temporary Works Coordinator to BS 5975 for contractors on Manchester and Greater Manchester sites, from city centre frames to large out of town schemes.
An area we serve from our Liverpool office, roughly 35 miles along the M62.
Discuss a TWC appointment in ManchesterTemporary works coordination in Manchester
Greater Manchester carries a busy pipeline of towers, frames and large sheds. Each brings a long list of temporary works items that must be designed, checked, installed and removed in the right order.
We provide a Temporary Works Coordinator who runs that process for you, attending Manchester sites in person and managing registers, briefs and checks from our Liverpool base.
See our main temporary works service or everything we offer in Manchester.
What we plan for in Manchester
Working in Manchester
We are a temporary works coordination consultancy for contractors working in Manchester. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.
We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.
Typical work
Falsework, back propping and edge protection systems moving up the building with the floor cycle.
Foundations and ties for tower cranes and hoists on dense city plots.
Temporary support and access for facade installation and retention.
Temporary stability of steel frames before the permanent bracing is complete.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need a Temporary Works Coordinator in Manchester?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Also in Manchester
Specialist support
Free downloads
High rise frames in Manchester and Salford carry a long list of temporary works that move with the floor cycle. This guide covers what a Temporary Works Coordinator should control on tower projects.
Read insightEvery temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightResponsibility for temporary works is shared across several roles. Here is who does what under CDM 2015 and BS 5975, including on multi contractor sites.
Read insightFAQ
Yes. We support contractors across Manchester and Greater Manchester, attending sites in person from our Liverpool office.
Yes. We coordinate falsework, back propping, crane bases and facade temporary works, arranging independent checks and controlling permits to BS 5975.
Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.