Temporary works to BS 5975

Falsework & Back Propping
Concrete Frames

Coordination of falsework, formwork and back propping on concrete frames, so every pour is supported and every strike happens at the right time.

Based in Liverpool. Supporting frame contractors across Manchester, Liverpool and the North West.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Falsework & Back Propping

On concrete frames the temporary works repeat every floor. Falsework supports each pour, back propping carries loads down through young slabs and striking depends on concrete strength.

We coordinate designs, checks, inspections and permits through the floor cycle so the frame keeps moving safely.

See our main temporary works service.

What we keep on top of

  • Back propping levels agreed with the frame designer
  • Concrete strength testing before striking
  • Changes to pour sequence reviewed before use
  • Edge protection integrated with falsework

What it covers

Falsework & Back Propping: what we cover

Falsework design

Designs and checks to BS 5975 for each pour arrangement.

Back propping

Propping schemes that carry construction loads through several floors.

Pour sign off

Inspection and permit to load before every pour.

Striking control

Permits to strike based on confirmed concrete strength.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with falsework and back propping?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Falsework & Back Propping: questions

What is falsework?

Falsework is the temporary structure that supports permanent works, such as a concrete slab, until they can support themselves.

What is back propping?

Back propping transfers construction loads from a newly cast slab down through the floors below until the concrete has gained enough strength.

Which part of BS 5975 covers falsework?

BS 5975 Part 2 covers the design, specification and use of falsework. Part 1 covers the temporary works procedure.

Temporary works

Need support with falsework and back propping?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.