LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
Temporary works coordination in St Helens
An independent Temporary Works Coordinator to BS 5975 for contractors on residential, brownfield and industrial schemes in St Helens.
An area we serve from our Liverpool office, around 12 miles along the East Lancashire Road.
Discuss a TWC appointment in St HelensTemporary works coordination in St Helens
St Helens has a long industrial history, so many sites are on former industrial land where ground conditions shape excavation support and working platforms.
Being a short drive from our Liverpool office, our Temporary Works Coordinators attend St Helens sites regularly and in person.
See our main temporary works service or everything we offer in St Helens.
What we plan for in St Helens
Working in St Helens
We are a temporary works coordination consultancy for contractors working in St Helens. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.
We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.
Typical work
Excavation support designed around variable made ground and old foundations.
Trench support, scaffolds and crane bases across multi plot sites.
Working platforms and frame stability on large sites.
Temporary support during demolition and partial retention.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need a Temporary Works Coordinator in St Helens?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Also in St Helens
Specialist support
Free downloads
Excavations collapse without warning. Here is how excavation support works, when it needs a design and what CDM 2015 requires.
Read insightTemporary works are far more common than many contractors realise. Here are the most common examples and why each one needs managing.
Read insightBS 5975 is the British Standard for controlling temporary works in the UK. This guide explains the current 2024 edition, the roles it sets out, design check categories 0 to 3, the register and the permit system.
Read insightFAQ
Yes. We support contractors across St Helens, around 12 miles from our Liverpool office.
Variable made ground, obstructions and contamination all affect excavation support and working platforms, so the design brief needs proper ground investigation behind it.
Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.