LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
Temporary works coordination in Bolton
An independent Temporary Works Coordinator to BS 5975 for contractors on housing, town centre and industrial schemes in Bolton.
An area we serve from our Liverpool office, around 30 miles via the M62 and M61.
Discuss a TWC appointment in BoltonTemporary works coordination in Bolton
Bolton work ranges from multi plot housing to town centre regeneration and industrial units near the M61. Each type brings its own temporary works, from trench support to temporary frame stability.
Our Temporary Works Coordinators bring one controlled process to every item, so nothing is loaded or struck without authority.
See our main temporary works service or everything we offer in Bolton.
What we plan for in Bolton
Working in Bolton
We are a temporary works coordination consultancy for contractors working in Bolton. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.
We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.
Typical work
Trench support, scaffolds and crane bases across multi plot sites.
Excavation support for deep drainage, attenuation tanks and utility connections.
Propping and support next to existing buildings.
Temporary stability of steel frames and slabs during erection.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need a Temporary Works Coordinator in Bolton?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Also in Bolton
Specialist support
Free downloads
Excavations collapse without warning. Here is how excavation support works, when it needs a design and what CDM 2015 requires.
Read insightTWC and TWS are often confused. Here is how the two BS 5975 roles differ, how they work together and when a project needs both.
Read insightThe Temporary Works Supervisor makes sure temporary works are installed, used and removed as designed. Here is what the role involves.
Read insightFAQ
Yes. We support contractors across Bolton from our Liverpool office, attending sites in person.
Where temporary works are planned, such as excavation support, scaffolds or crane bases, a competent TWC should run the procedure. On larger housing sites that is almost always the case.
Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.