Temporary works to BS 5975

Temporary Works Register
BS 5975

One live register of every temporary works item on site, showing its designer, check category, design status, inspections and permits from first identification to removal.

Based in Liverpool. Supporting contractors across the North West and the UK.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Temporary Works Register

The temporary works register is the backbone of the BS 5975 procedure. If an item is not on the register, nobody is controlling its design, check, inspection or removal.

We set up registers at the start of a project, take over registers that have drifted and keep them current as the work changes.

See our main temporary works service.

What we keep on top of

  • Items identified from the programme, not discovered on site
  • Check categories agreed before design starts
  • Status visible to everyone who needs it
  • Items closed only when removed and recorded

What it covers

Temporary Works Register: what we cover

Register set up

Every item identified from the programme, drawings and RAMS before work starts.

Design status

Brief, design, check category and certificate tracked for each item.

Permits and inspections

Permits to load and strike plus inspection records linked to each entry.

Register reviews

Regular reviews with package managers so new items are captured early.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with temporary works register?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Register: questions

What is a temporary works register?

A live list of every temporary works item on a project, showing who designs it, its check category, design and check status, inspections and permits to load and strike.

Who maintains the temporary works register?

The Temporary Works Coordinator is responsible for maintaining the register, with input from supervisors, designers and package managers.

Can you take over a register on a live project?

Yes. We audit the existing register against what is on site, close the gaps and then keep it current.

Temporary works

Need support with temporary works register?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com