Temporary works coordination in North Wales

Temporary Works Coordinator
North Wales

An independent Temporary Works Coordinator to BS 5975 for contractors in North Wales, from large industrial and manufacturing sites on Deeside to housing, highways and coastal schemes along the A55.

Served from our Liverpool office. Deeside and the Flintshire border are around 25 miles away via the M53 and A55.

Discuss a TWC appointment in North Wales

0151 332 6581info@matthewsroberts.com

Temporary works coordination in North Wales

An independent Temporary Works Coordinator for North Wales contractors

North Wales has a strong industrial base around Deeside, Flintshire and Wrexham, alongside housing growth, highway improvements and coastal and flood defence work. Temporary works on these sites range from heavy propping and excavation support inside live plants to cofferdams and access structures near the coast.

We provide an independent Temporary Works Coordinator who sets up and runs the register, issues design briefs, arranges independent checks and controls permits to load and strike. Our experience on a £2bn industrial scheme in the Chester area, just over the border, shows how we manage large registers with many Category 3 items.

See our main temporary works service or everything we offer in North Wales.

What we plan for in North Wales

  • Client permit systems and isolations on live industrial sites
  • Ground conditions and groundwater near rivers, estuaries and the coast
  • Exposure and wind loading on coastal and upland sites
  • Large registers with many Category 2 and 3 items needing independent checks

Working in North Wales

Temporary works coordination consultancy in North Wales

We are a temporary works coordination consultancy for contractors working in North Wales. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in North Wales

Industrial and manufacturing sites

Temporary works inside and next to operating plants, coordinated with client permits, isolations and shutdown windows.

Excavation support and cofferdams

Trench support, sheet piling and cofferdams for drainage, utilities and work near rivers and the coast.

Housing developments

Retaining walls, piling platforms, scaffolds and crane bases across phased residential sites.

Highway and bridge works

Falsework, propping and access structures on schemes alongside live roads such as the A55 and A494.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in North Wales?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 10 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Coordinator North Wales: questions

Do you provide a Temporary Works Coordinator in North Wales?

Yes. We support contractors across North Wales, including Deeside, Flintshire, Wrexham and the A55 corridor, attending sites in person from our Liverpool office.

Does BS 5975 apply in Wales?

Yes. BS 5975 is a British Standard and is used across England, Wales and Scotland. CDM 2015 also applies in Wales, so the same temporary works procedure and duties apply on North Wales sites.

Can you manage temporary works on a live manufacturing site?

Yes. We align the temporary works procedure with the client's own permits and isolations, as we did on a large industrial scheme in the Chester area.

Can you take over temporary works on a North Wales project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in North Wales?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.