Temporary works to BS 5975

Excavation Support
Temporary Works

Coordination of excavation support temporary works, from trench boxes and drag boxes to sheet piles, cofferdams and propped basements.

Based in Liverpool. Supporting contractors across the North West and the UK.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Excavation Support

Excavations collapse without warning. CDM 2015 requires every excavation to be prevented from collapsing and inspected by a competent person. Many need designed temporary works.

We coordinate excavation support from the ground investigation through design, check, installation and inspection to removal.

See our main temporary works service.

What we keep on top of

  • Ground investigation used to brief the designer
  • Surcharge from plant, spoil and adjacent structures
  • Groundwater and dewatering arrangements
  • Buried services located before digging

What it covers

Excavation Support: what we cover

Trench support

Trench boxes, drag boxes and hydraulic frames selected for the ground and depth.

Sheet piles and cofferdams

Designed and checked schemes for deep or water bearing excavations.

Basement propping

Propped excavations next to existing buildings and highways.

Inspections

Inspection at the start of each shift and after any event affecting stability.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with excavation support?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Excavation Support: questions

Is excavation support temporary works?

Yes. Any support that keeps an excavation stable during construction is temporary works and should be managed through the BS 5975 procedure.

How often must excavations be inspected?

CDM 2015 requires inspection by a competent person at the start of each shift, after any event likely to affect stability and after any accidental fall of rock or material.

Do trench boxes need a design?

Proprietary systems still need selecting and checking for the depth, ground and surcharge. Bespoke or deep schemes need a full design and check.

Temporary works

Need support with excavation support?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.