Temporary works coordination in Wigan

Temporary Works Coordinator
Wigan

An independent Temporary Works Coordinator to BS 5975 for contractors on industrial, logistics and residential schemes in Wigan.

An area we serve from our Liverpool office, around 20 miles via the M58 and M6.

Discuss a TWC appointment in Wigan

0151 332 6581info@matthewsroberts.com

Temporary works coordination in Wigan

An independent Temporary Works Coordinator for Wigan contractors

Wigan's position on the M6 corridor brings large industrial and logistics buildings, where temporary frame stability, slab works and heavy lifting dominate the temporary works register.

We provide a Temporary Works Coordinator who plans those items ahead of the programme and controls every permit.

See our main temporary works service or everything we offer in the North West.

What we plan for in Wigan

  • Temporary stability of frames before roof and wall bracing
  • Crane working platforms on large open sites
  • Ground conditions on former mining and industrial land
  • Sequencing with specialist equipment installers

Working in Wigan

Temporary works coordination consultancy in Wigan

We are a temporary works coordination consultancy for contractors working in Wigan. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in Wigan

Steel frame stability

Temporary bracing and stability during erection of large span frames.

Heavy lifts

Crane platforms and lifting arrangements for frames, cladding and plant.

Slabs and pits

Excavation support for pits, sumps and deep foundations.

Residential

Trench support and scaffolds on housing schemes.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in Wigan?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Coordinator Wigan: questions

Do you provide a Temporary Works Coordinator in Wigan?

Yes. We support contractors across Wigan from our Liverpool office, around 20 miles away.

Is temporary stability of a steel frame a temporary works item?

Yes. Temporary bracing and the erection sequence that keeps a frame stable before permanent bracing is complete should be designed, checked and controlled as temporary works.

Can you take over temporary works on a Wigan project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in Wigan?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections