Temporary works design in Manchester

Temporary Works Design
Manchester

Temporary works design and independent design checks through our engineering partners for contractors in Manchester and Greater Manchester. Propping, excavation support, falsework and facade retention.

An area we serve from our Liverpool office, roughly 35 miles along the M62.

Discuss temporary works design in Manchester

0151 332 6581info@matthewsroberts.com

Temporary works design in Manchester

Temporary works design for Manchester contractors

Temporary works on projects in Manchester and Greater Manchester cover the full range, from high rise residential and commercial towers in the city core, logistics and industrial sheds near the motorway network plus utilities work such as major treatment works. Each design has to reflect the ground, the loads and the way the site will actually build.

We arrange temporary works design and independent checks at the right category through our engineering partners and coordinate them through your temporary works procedure. We attend Greater Manchester sites in person from our Liverpool office, around 35 miles along the M62.

See our main temporary works design service or everything we offer in Manchester.

What we plan for in Manchester

  • Crane, hoist and vertical logistics planning on dense city plots
  • Metrolink, highway and neighbour interfaces around the core
  • Design check category agreed before design starts
  • Clear design briefs with site specific ground information

Working in Manchester

Temporary works design consultancy in Manchester

Matthews & Roberts works as a temporary works design consultancy for contractors in Manchester, arranging designs and independent checks through our engineering partners. We cover propping, excavation support, falsework, formwork and facade retention.

Because we also provide temporary works coordinators, each design is briefed properly, checked at the right category and controlled on site through permits to load and strike.

Typical work

Temporary works we design for in Manchester

Propping and needling

Temporary support for existing structures during alteration and demolition.

Excavation support

Trench support, sheet piles and propped excavations designed from ground data.

Falsework and formwork

Designs for slabs, walls and structures.

Independent design checks

Checks at the category BS 5975 sets for the risk.

Scope

What we design and check

Propping and needling
Support for existing structures.
Excavation support
Trenches, sheet piles and propped excavations.
Falsework and formwork
For slabs, walls and structures.
Facade retention
Retention schemes sequenced with the new frame.
Crane and hoist bases
Foundations and ties.
Independent checks
At the category BS 5975 requires.

Standards

The standards behind the work

Need temporary works design in Manchester?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Design Manchester: questions

Do you provide temporary works design in Manchester?

Yes. We arrange temporary works design and independent checks for contractors across Manchester and Greater Manchester through our engineering partners. We attend Greater Manchester sites in person from our Liverpool office, around 35 miles along the M62.

What design check category does my temporary works need?

BS 5975 sets categories 0 to 3 based on complexity and risk. Category 2 needs a checker from outside the design team and category 3 needs an independent organisation.

Can you provide the Temporary Works Coordinator as well?

Yes. Our temporary works team provides coordinators to run the procedure on site.

Temporary works design

Need temporary works design in Manchester?

Tell us about your project and what you need. We will come back within one working day with a clear proposal and a named consultant.

  • Propping and excavation support
  • Falsework and formwork
  • Facade retention
  • Independent design checks

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.