Temporary Works Register Template
A free, editable Excel register for tracking every temporary works item on site, from the design brief and design check category to the permit to load and permit to strike.
Free downloads
Practical templates we use on site, free to download in Word, Excel and PDF. Registers, notices and checklists for temporary works, commercial management, JCT and NEC4 contracts, health and safety and project mobilisation.

A free, editable Excel register for tracking every temporary works item on site, from the design brief and design check category to the permit to load and permit to strike.

A free checklist for appointing a Temporary Works Coordinator, covering competence, the written appointment, Temporary Works Supervisors and the systems that need to be in place.

Free, editable permit to load and permit to strike forms with the checks a Temporary Works Supervisor and Coordinator should complete before loading or removing temporary works.

A free design brief for temporary works. It gives the designer the scope, site information, loads, programme and check category needed for a safe, buildable design.

A free Excel register for recording excavation inspections at the start of every shift and after any event that could affect stability.

A free Excel register for recording scaffold inspections after erection, every seven days and after any event that could affect safety.

A free cost value reconciliation template in Excel with formulas built in. Reconcile value, cost and accruals by cost code and see margin to date and forecast margin every month.

Free, editable payment notice and Pay Less notice templates that set out the sum considered due, the basis of calculation and the key dates under the Construction Act.

A free Excel daywork sheet for recording labour, plant and materials on instructed daywork, with automatic subtotals, additions and a sign off block.

A free Excel bill of quantities set out by NRM2 work section. Quantities multiply by rates automatically, with preliminaries, overheads and contingency at the foot.

A free Excel register that logs every instruction from receipt to agreement. Quoted and agreed values total automatically and feed straight into your CVR.

A free Excel final account summary that adjusts the contract sum line by line, with submitted and agreed figures side by side and the balance due calculated.

A free Excel application for payment. Enter contract values and percentage complete, then variations, materials and retention. The amount due calculates automatically.
A free Excel tracker that shows the retention held on every contract, when each release falls due and what is still outstanding.

A free monthly cost report for clients and funders. Budget, changes, committed cost and forecast by cost heading, with the variance and key risks.

A free Word template for a contractor's notice of delay under a JCT contract, structured around the material circumstances, the cause, the expected effects and the estimated delay.

A free Excel early warning register for NEC4 contracts. Record each matter, its potential effect on the Prices, Completion, a Key Date or performance and the actions agreed to reduce it.

A free Word template for notifying a compensation event under NEC4, with sections for the event, the clause relied on, the expected effect, early warnings and timing.

A free RFI form for asking the design team or client a clear question, with the impact if it is not answered on time. Includes an RFI register to track every request.

A free CVI form for confirming an instruction given on site in writing, so the change is recorded before the work is done.

A free checklist for reviewing subcontractor risk assessments and method statements before work starts, covering scope, hazards, people, plant, emergencies and communication.

A free checklist for weekly or periodic construction site safety inspections, with sections for set up, access, work at height, excavations, plant, lifting and health, plus an action log.

A free, editable Construction Phase Plan for CDM 2015. It covers the project team, site rules, significant risks, welfare and the health and safety file, ready to make site specific.

A free risk assessment and method statement template for a defined task on site. It sets out the sequence of work, the hazards, the controls and who has been briefed.

A free checklist for auditing a construction site. It covers the management documents, site conditions, health and welfare, with an action log and sign off.

A free checklist of the pre construction information a client should provide under CDM 2015, from surveys and services to significant design risks.

A free checklist for compiling the CDM 2015 health and safety file, so the client receives what they need to work on the building safely in future.

A free questionnaire for checking a subcontractor before appointment: accreditation, insurance, health and safety, competence and capacity, with a scoring table.

A free checklist that takes a project from contract award to the first weeks on site, covering the contract, programme, CDM, site set up and supply chain.

A free Excel ITP for any work package. List each stage, its inspection or test, the acceptance criteria and whether it is a hold or witness point.

A free Excel snagging list for recording defects before handover, with owners, target dates and a running count of open and closed snags.

A free weekly report covering safety, progress against programme, the look ahead, open RFIs, the commercial position and the risks to watch.

A free Excel scorecard for deciding whether to tender. Weighted criteria give a score and a recommendation: bid, review or no bid.
The people behind the templates
FAQ
Yes. Every template is free to download with no sign up. They are white labelled so you can add your own company name and logo.
Registers and calculators are editable Excel files. Notices and checklists are editable Word files. Every template also has a PDF version for printing.
Yes. Use and adapt them on your own projects. Check the clauses, periods and procedures in your own contract before use.
Yes. We provide Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales. Call 0151 332 6581 or email info@matthewsroberts.com.
Talk to us
Tell us what you need. We add new templates regularly and can help put the process in place on your project.