Temporary works coordination in Wirral

Temporary Works Coordinator
Wirral & Birkenhead

An independent Temporary Works Coordinator to BS 5975 for contractors on the Wirral, including Birkenhead and the dock estates.

A short trip from our Liverpool office through the Mersey tunnels.

Discuss a TWC appointment in Wirral

0151 332 6581info@matthewsroberts.com

Temporary works coordination in Wirral

An independent Temporary Works Coordinator for Wirral contractors

Wirral regeneration around Birkenhead and the docks brings excavations close to water, old dock walls and existing infrastructure, all of which need careful temporary works control.

Our Temporary Works Coordinators are a short trip away through the Mersey tunnels, so we can be on site quickly and often.

See our main temporary works service or everything we offer in Wirral.

What we plan for in Wirral

  • Old dock walls and buried structures
  • Tidal water levels and groundwater
  • Protection of existing infrastructure
  • Historic buildings within regeneration areas

Working in Wirral

Temporary works coordination consultancy in Wirral

We are a temporary works coordination consultancy for contractors working in Wirral. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in Wirral

Dockside excavations

Excavation support and dewatering next to dock walls and water.

Regeneration schemes

Propping and support next to retained and historic structures.

Housing

Trench support, scaffolds and crane bases on residential sites.

Infrastructure interfaces

Temporary works near existing tunnels, utilities and highways.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in Wirral?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Coordinator Wirral: questions

Do you provide a Temporary Works Coordinator on the Wirral?

Yes. We support contractors across the Wirral, including Birkenhead and Wallasey, from our Liverpool office.

Do excavations near water need a higher design check?

Often. The check category depends on complexity and risk. Excavations near water, with dewatering or next to existing structures, frequently sit at the higher categories.

Can you take over temporary works on a Wirral project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in Wirral?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections