LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
Temporary works coordination in Chester
An independent Temporary Works Coordinator to BS 5975 for contractors in Chester and Cheshire, from heritage sites to large industrial schemes.
An area we serve from our Liverpool office, around 20 miles to the south.
Discuss a TWC appointment in ChesterTemporary works coordination in Chester
Chester and Cheshire bring two very different temporary works environments: constrained heritage sites in the historic city and large industrial schemes around Deeside and the motorway corridors.
We provide Temporary Works Coordinators experienced in both, including large registers where a high proportion of items sit at Category 3.
See our main temporary works service or everything we offer in Chester.
What we plan for in Chester
Working in Chester
We are a temporary works coordination consultancy for contractors working in Chester. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.
We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.
Typical work
Registers with hundreds of items, independent checks and tightly sequenced permits.
Propping, needling and facade support in and around the historic core.
Temporary support for older structures during alteration and repair.
Temporary works alongside live roads.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need a Temporary Works Coordinator in Chester?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Also in Chester & Cheshire
Specialist support
Free downloads
Matthews & Roberts has been appointed Temporary Works Consultant on a £2bn manufacturing facility. The scale of the scheme calls for critical interface management, a robust procedure and a structured engagement strategy across every package.
Read insightThe temporary works register is the backbone of the BS 5975 procedure. Here is what it must include and how to stop it going out of date.
Read insightEvery temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightFAQ
Yes. We support contractors across Chester and Cheshire from our Liverpool office. See our case studies below for examples.
Yes. Our case study on a £2bn industrial scheme in the Chester area describes a live register of more than 1,200 items.
Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.