Temporary Works Design Brief: What to Include
Most temporary works design problems start with a poor brief. Here is what a good one includes.
Read insightFree template · Temporary works
A free design brief for temporary works. It gives the designer the scope, site information, loads, programme and check category needed for a safe, buildable design.
Free to download, no sign up. White labelled so you can add your own company name and logo.
Need help using it?0151 332 6581info@matthewsroberts.com

About this template
A poor brief is one of the most common causes of temporary works problems. The designer can only design for the information they are given.
This template prompts the Temporary Works Coordinator for everything a designer needs: the purpose, site conditions, loads, sequence and the category of independent check.
What is included
Temporary works
Temporary works procedures link together. These guides and templates cover the rest of the process.
Guides
Free templates
Where we have delivered this
Prefer us to run it for you? Temporary Works
How to use it
Raise the brief as soon as the temporary works item is identified and add it to the register.
Gather ground information, existing structures, loads and programme before issue.
Agree the design check category so the right checker is lined up.
Issue the brief and track the design and check on the register.
Avoid these
Prefer us to handle it?
Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.
Send us a messageRelated services
Most temporary works design problems start with a poor brief. Here is what a good one includes.
Read insightNot every temporary works design needs a specialist engineer, but every design needs a competent designer and a suitable check.
Read insightFree resources
FAQ
Normally the Temporary Works Coordinator, with input from the site team and the permanent works designer where needed.
The purpose, site information, loads, programme, constraints, design requirements and the design check category.
BS 5975 sets out the brief as part of the recognised temporary works procedure.
Yes. Our Temporary Works Coordinators prepare briefs and manage design and checks on contractors' projects.
Talk to us
Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.
Email info@matthewsroberts.com
3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR