Category 3 Temporary Works
North West

Coordination of complex and novel temporary works at Category 3, where the design must be checked by an organisation independent of the designer.

Based in Liverpool. Supporting contractors across the North West and the UK.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Category 3 Temporary Works

Category 3 covers complex or novel temporary works, or designs involving significant risk. BS 5975 requires these to be checked by a separate organisation from the designer.

We coordinate the whole process: design briefs, appointment of the independent checker, check certificates and the permits that follow.

See our main temporary works service.

What we keep on top of

  • Agree the check category before design starts
  • Allow enough programme time for an independent check
  • Control changes to checked designs
  • Keep certificates with the register

What it covers

Category 3 Temporary Works: what we cover

Design briefs

Full briefs with loads, constraints, ground information and interfaces.

Independent checkers

Appointment and management of a separate checking organisation.

Check certificates

Certificates received and recorded before construction.

Large registers

Control of programmes with hundreds of high category items.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with category 3 temporary works?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Category 3 Temporary Works: questions

What is a Category 3 temporary works check?

Under BS 5975, Category 3 applies to complex or novel designs. The check must be carried out by an organisation independent of the designer.

Who decides the check category?

The Temporary Works Coordinator agrees the category with the designer, based on the complexity and risk of the item.

Do you have experience of large Category 3 registers?

Yes. Our case study on a £2bn industrial scheme in the Chester area describes a register where more than 300 items sit at Category 3.

Temporary works

Need support with category 3 temporary works?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections