Independent TWC and TWS services to BS 5975

Temporary Works
Coordination

Temporary works rarely fail because of poor engineering. They fail when the process around them is not managed. We provide independent Temporary Works Coordinators and Supervisors who put that process in place and keep it working until the final permit is closed.

Based in Liverpool. Supporting contractors across the UK.

Discuss your temporary works

What we do

Independent temporary works coordination for contractors

BS 5975 sets out a disciplined process for temporary works, from first identification through design, checking, installation, use and removal. A competent Temporary Works Coordinator is what makes that process work on site.

We provide that role for contractors who need a competent, independent TWC without carrying the resource permanently, or where independence cannot be achieved within their own team.

Need the temporary works designed as well? Temporary works design is available through our engineering team.

What we provide

Independent TWC appointment
A competent, independent coordinator for as long as the project needs one.
TWS support
Supervision on site under the TWC throughout construction.
Temporary works register
Set up at the start and kept current until the final close out.
Design briefs and checks
Briefs coordinated with designers and checks managed to category.
Permit control
Permits to load and dismantle issued, tracked and closed out.

How we help

Temporary works services

Open any service to see what it covers.

Temporary Works Coordinator (TWC)

Overall control of the temporary works process.

A competent, independent TWC taking overall responsibility for temporary works in line with BS 5975. We set up and manage the register, assign design check categories, coordinate design briefs and checks, accept designs for use and control permits throughout construction.

TWC provisionRegister managementDesign check categoriesDesign acceptancePermit control

Temporary Works Supervisor (TWS)

Supervision on site under the appointed TWC.

Support on site working under the TWC to supervise installation, use and dismantling. We check installations before loading, manage permit conditions on site and keep site records aligned with the approved design.

TWS provisionInstallation supervisionChecks before loadingPermit conditionsSite records

Temporary works register

One live record of every temporary works item.

A register set up for the project in line with BS 5975. Each item is recorded with its design check category, design status, check status and permit position, giving the whole project team one current view.

Project registerBS 5975Design statusCheck recordsPermit tracking

Design briefs and design checks

Briefs coordinated, checks managed to category.

We coordinate design briefs between the site team, the permanent works designer and the temporary works designers. We then manage checking to the category each design requires, arranging independent checks through our professional network where needed.

Design briefsCategory 0 to 3Independent checksCheck certificates

Permits to load and dismantle

Nothing loaded or removed without authority.

We set up the permit system for the project, issuing and closing out permits to load and permits to dismantle with a clear record at every stage. Permits to use can be added where the project requires them.

Permit to loadPermit to dismantlePermit recordsChange control

Temporary works reviews and audits

An independent check of your current arrangements.

An independent review of your temporary works arrangements against BS 5975. We assess the register, design check categories, check records, permits and site controls, then provide a prioritised action plan.

BS 5975 reviewGap analysisRegister auditAction plan

The roles

TWC and TWS: clear responsibility at every level

Both roles work within the temporary works procedure set by the contractor's Designated Individual.

Temporary Works Coordinator (TWC)

Manages the temporary works process across the project.

The TWC has overall responsibility for temporary works on the project. That covers the register, design check categories, checks, design acceptance and the permit system throughout construction.

  • Maintain the temporary works register
  • Assign design check categories
  • Brief and coordinate designers
  • Manage the design check process
  • Accept designs for installation
  • Issue permits to load
  • Arrange regular reviews
  • Issue permits to dismantle

Temporary Works Supervisor (TWS)

Supervises temporary works on site under the TWC.

The TWS works under the TWC to supervise temporary works on site, making sure installation, use, alteration and dismantling follow the approved design and permit conditions.

  • Supervise installation to approved drawings
  • Check installations before loading
  • Manage permit conditions on site
  • Monitor temporary works in use
  • Control changes during use
  • Supervise dismantling
  • Keep site records
  • Escalate issues to the TWC

Temporary works on a live project that need attention?

Speak to our team

BS 5975

Four principles of temporary works control

BS 5975 is the UK code of practice for temporary works procedures. These principles sit at its core.

01

Competence

The Designated Individual, TWC and TWS must have the skills, knowledge and experience the temporary works require.

02

Design check category

Every item is given a category from 0 to 3, which sets how independent its design check must be.

03

Independent checking

Category 2 checks are carried out by someone not involved in the design. Category 3 checks by a separate organisation.

04

Permit control

Permits to load and dismantle control when temporary works can take load and when they can be removed.

When you need us

Common reasons contractors appoint an independent TWC

Some contractors appoint us at tender or mobilisation. Others call when existing arrangements need urgent attention.

No competent TWC in your team

The project needs a formal TWC appointment but no suitably competent person is available in your team.

Independence cannot be met internally

Your team is designing or building the temporary works, so the independence the process needs cannot be achieved internally.

The register and controls are not in place

Work is underway but the register, design check categories, check records and permit system have not been properly set up.

Complex or high risk temporary works

The project involves Category 2 or Category 3 temporary works that need independent checks and a more experienced TWC.

Client or CDM requirement

The principal contractor must show that competent temporary works arrangements are in place as part of their CDM duties.

Existing arrangements are being challenged

Your temporary works system is being questioned by the client, the Principal Designer, the HSE or an internal review.

The detail

How the temporary works system runs

The register is the backbone of the system. It shows what has been identified, the category it sits in, where each design is in the check process and which permits are live.

Types of temporary works we coordinate

From excavation support to temporary bridges.
  • Excavation support

    Sheet piling, trench boxes, close timbering, drag boxes

  • Falsework

    Formwork support systems, propping, shoring

  • Scaffolding

    Access and support scaffolding, independent and tied systems

  • Propping

    Structural propping during demolition, retained facades, underpinning

  • Working platforms

    Crane pads, piling rig platforms, tracked plant platforms

  • Earthworks

    Slopes, batters, embankments, retained structures

  • Cofferdams

    Sheet pile cofferdams, caissons, timber cofferdams

  • Temporary bridges

    Temporary bridging, gantries, launching systems

What the register tracks

Every item from identification to close out.
  • Item reference
  • Description and location
  • Design check category
  • Designer appointment
  • Drawings and specifications
  • Check requirement
  • Check status
  • Acceptance for installation
  • Permit to load
  • Permit to use where required
  • Monitoring requirements
  • Change control
  • Permit to dismantle
  • Close out record

How temporary works connects with the project

Programme, CDM, permits and handover.

Temporary works requirements should appear in the programme, subcontractor briefings, design information registers and the Construction Phase Plan. We make sure they do.

  • Construction programme
  • Construction Phase Plan
  • Site permit systems
  • Subcontractor packages
  • Design information registers
  • Site logistics and access
  • Quality inspection records
  • Handover documentation

What we produce

Records scoped to your project.
  • TWC appointment documentation
  • Temporary works register
  • Design check category assignments
  • Design briefs
  • Design review records
  • Independent check records
  • Permit to load records
  • Permit to dismantle records
  • Change control records
  • Temporary works reviews
  • BS 5975 gap analysis
  • Monthly register reports
  • Handover documentation support
Insights
View all insights

FAQ

Temporary works questions from contractors

What is a Temporary Works Coordinator?

A Temporary Works Coordinator is a competent person appointed by the contractor to manage temporary works on a project in line with BS 5975. The TWC maintains the register, assigns design check categories, coordinates design briefs and checks, accepts designs for use and controls the permit system throughout construction.

When is a Temporary Works Coordinator required?

A TWC should be appointed on any project with temporary works that need design, checking and control. That includes excavation support, falsework, scaffolding, propping, working platforms, earthworks and cofferdams. The experience required depends on the complexity and category of the works.

What is the difference between a TWC and a TWS?

The TWC manages the temporary works process across the project, including the register, design check categories, checks and permits. The TWS works on site under the TWC, supervising installation, use and dismantling in line with the approved design and permit conditions.

What are the temporary works design check categories?

BS 5975 gives each item a design check category from 0 to 3. Categories 0 and 1 can be checked by another member of the design team. Category 2 must be checked by someone not involved in the design. Category 3 must be checked by a separate organisation. The TWC assigns the category and manages the checking process.

Can the TWC be someone from our own team?

Yes, if they have the required competence. Where your own team is designing or building the temporary works, an external TWC is often the better choice to keep the process independent. We provide independent TWC services where an internal appointment is not suitable or the experience is not available within your team.

What is a permit to load?

A permit to load confirms that installed temporary works have been checked against the approved design and can safely take load. It is issued by the TWC, or by a TWS with delegated authority, after a satisfactory inspection. Work that loads the temporary works must not start without it.

Can you take over temporary works on a project already underway?

Yes. We regularly step into live projects where arrangements need to be set up, strengthened or taken over from a TWC who has left. We review the current position first, then agree the priority actions to bring the system into line with BS 5975.

Can you audit our existing temporary works arrangements?

Yes. We carry out independent reviews against BS 5975 covering the register, design check categories, check records, permits and site controls, with a prioritised action plan at the end.

How does temporary works coordination link with CDM?

Temporary works are one of the most significant risks in the construction phase. The Construction Phase Plan should set out how they are managed. The Principal Contractor must make sure suitable arrangements are in place. We link temporary works coordination with our CDM support so the plan reflects how temporary works are managed on site.

Do you provide temporary works design?

Yes. Temporary works design is available through our engineering team. We can coordinate the design brief, the design and the check together, giving you one point of contact.

Where do you provide temporary works coordination?

We are based in Liverpool and support contractors across the UK, including Liverpool, Manchester and the wider North West.

Can you provide a TWC and TWS together?

Yes. On larger or more complex projects we can provide both roles, with clear accountability at each level and consistent records throughout.

Temporary works coordination

Need a competent, independent TWC for your project?

Whether you need a TWC from day one, support on a project already underway, a review of your current arrangements or TWS support on site, we can help.

  • Independent TWC appointment
  • TWS support on site
  • Temporary works register
  • Design briefs and checks to category
  • Permits to load and dismantle
  • BS 5975 reviews and audits