Temporary works rarely fail because of poor engineering. They fail when the process around them is not managed. We provide independent Temporary Works Coordinators and Supervisors who put that process in place and keep it working until the final permit is closed.
Based in Liverpool. Supporting contractors across the UK.
Independent temporary works coordination for contractors
BS 5975 sets out a disciplined process for temporary works, from first identification through design, checking, installation, use and removal. A competent Temporary Works Coordinator is what makes that process work on site.
We provide that role for contractors who need a competent, independent TWC without carrying the resource permanently, or where independence cannot be achieved within their own team.
Need the temporary works designed as well? Temporary works design is available through our engineering team.
What we provide
Independent TWC appointment
A competent, independent coordinator for as long as the project needs one.
TWS support
Supervision on site under the TWC throughout construction.
Temporary works register
Set up at the start and kept current until the final close out.
Design briefs and checks
Briefs coordinated with designers and checks managed to category.
Permit control
Permits to load and dismantle issued, tracked and closed out.
How we help
Temporary works services
Open any service to see what it covers.
Temporary Works Coordinator (TWC)
Overall control of the temporary works process.
A competent, independent TWC taking overall responsibility for temporary works in line with BS 5975. We set up and manage the register, assign design check categories, coordinate design briefs and checks, accept designs for use and control permits throughout construction.
TWC provisionRegister managementDesign check categoriesDesign acceptancePermit control
Temporary Works Supervisor (TWS)
Supervision on site under the appointed TWC.
Support on site working under the TWC to supervise installation, use and dismantling. We check installations before loading, manage permit conditions on site and keep site records aligned with the approved design.
TWS provisionInstallation supervisionChecks before loadingPermit conditionsSite records
Temporary works register
One live record of every temporary works item.
A register set up for the project in line with BS 5975. Each item is recorded with its design check category, design status, check status and permit position, giving the whole project team one current view.
We coordinate design briefs between the site team, the permanent works designer and the temporary works designers. We then manage checking to the category each design requires, arranging independent checks through our professional network where needed.
Design briefsCategory 0 to 3Independent checksCheck certificates
We set up the permit system for the project, issuing and closing out permits to load and permits to dismantle with a clear record at every stage. Permits to use can be added where the project requires them.
Permit to loadPermit to dismantlePermit recordsChange control
Temporary works reviews and audits
An independent check of your current arrangements.
An independent review of your temporary works arrangements against BS 5975. We assess the register, design check categories, check records, permits and site controls, then provide a prioritised action plan.
BS 5975 reviewGap analysisRegister auditAction plan
The roles
TWC and TWS: clear responsibility at every level
Both roles work within the temporary works procedure set by the contractor's Designated Individual.
Temporary Works Coordinator (TWC)
Manages the temporary works process across the project.
The TWC has overall responsibility for temporary works on the project. That covers the register, design check categories, checks, design acceptance and the permit system throughout construction.
Maintain the temporary works register
Assign design check categories
Brief and coordinate designers
Manage the design check process
Accept designs for installation
Issue permits to load
Arrange regular reviews
Issue permits to dismantle
Temporary Works Supervisor (TWS)
Supervises temporary works on site under the TWC.
The TWS works under the TWC to supervise temporary works on site, making sure installation, use, alteration and dismantling follow the approved design and permit conditions.
BS 5975 is the UK code of practice for temporary works procedures. These principles sit at its core.
01
Competence
The Designated Individual, TWC and TWS must have the skills, knowledge and experience the temporary works require.
02
Design check category
Every item is given a category from 0 to 3, which sets how independent its design check must be.
03
Independent checking
Category 2 checks are carried out by someone not involved in the design. Category 3 checks by a separate organisation.
04
Permit control
Permits to load and dismantle control when temporary works can take load and when they can be removed.
When you need us
Common reasons contractors appoint an independent TWC
Some contractors appoint us at tender or mobilisation. Others call when existing arrangements need urgent attention.
No competent TWC in your team
The project needs a formal TWC appointment but no suitably competent person is available in your team.
Independence cannot be met internally
Your team is designing or building the temporary works, so the independence the process needs cannot be achieved internally.
The register and controls are not in place
Work is underway but the register, design check categories, check records and permit system have not been properly set up.
Complex or high risk temporary works
The project involves Category 2 or Category 3 temporary works that need independent checks and a more experienced TWC.
Client or CDM requirement
The principal contractor must show that competent temporary works arrangements are in place as part of their CDM duties.
Existing arrangements are being challenged
Your temporary works system is being questioned by the client, the Principal Designer, the HSE or an internal review.
The detail
How the temporary works system runs
The register is the backbone of the system. It shows what has been identified, the category it sits in, where each design is in the check process and which permits are live.
Types of temporary works we coordinate
From excavation support to temporary bridges.
Excavation support
Sheet piling, trench boxes, close timbering, drag boxes
Falsework
Formwork support systems, propping, shoring
Scaffolding
Access and support scaffolding, independent and tied systems
Propping
Structural propping during demolition, retained facades, underpinning
Temporary works requirements should appear in the programme, subcontractor briefings, design information registers and the Construction Phase Plan. We make sure they do.
BS 5975 is the British Standard for controlling temporary works in the UK. This guide explains the current 2024 edition, the roles it sets out, design check categories 0 to 3, the register and the permit system.
Matthews & Roberts has been appointed Temporary Works Consultant on a £2bn manufacturing facility. The scale of the scheme calls for critical interface management, a robust procedure and a structured engagement strategy across every package.
Matthews & Roberts has been appointed Temporary Works Consultant on a major infrastructure project on the M56, managing temporary works for the structural conversion of three barns predating 1800.
A Temporary Works Coordinator is a competent person appointed by the contractor to manage temporary works on a project in line with BS 5975. The TWC maintains the register, assigns design check categories, coordinates design briefs and checks, accepts designs for use and controls the permit system throughout construction.
When is a Temporary Works Coordinator required?
A TWC should be appointed on any project with temporary works that need design, checking and control. That includes excavation support, falsework, scaffolding, propping, working platforms, earthworks and cofferdams. The experience required depends on the complexity and category of the works.
What is the difference between a TWC and a TWS?
The TWC manages the temporary works process across the project, including the register, design check categories, checks and permits. The TWS works on site under the TWC, supervising installation, use and dismantling in line with the approved design and permit conditions.
What are the temporary works design check categories?
BS 5975 gives each item a design check category from 0 to 3. Categories 0 and 1 can be checked by another member of the design team. Category 2 must be checked by someone not involved in the design. Category 3 must be checked by a separate organisation. The TWC assigns the category and manages the checking process.
Can the TWC be someone from our own team?
Yes, if they have the required competence. Where your own team is designing or building the temporary works, an external TWC is often the better choice to keep the process independent. We provide independent TWC services where an internal appointment is not suitable or the experience is not available within your team.
What is a permit to load?
A permit to load confirms that installed temporary works have been checked against the approved design and can safely take load. It is issued by the TWC, or by a TWS with delegated authority, after a satisfactory inspection. Work that loads the temporary works must not start without it.
Can you take over temporary works on a project already underway?
Yes. We regularly step into live projects where arrangements need to be set up, strengthened or taken over from a TWC who has left. We review the current position first, then agree the priority actions to bring the system into line with BS 5975.
Can you audit our existing temporary works arrangements?
Yes. We carry out independent reviews against BS 5975 covering the register, design check categories, check records, permits and site controls, with a prioritised action plan at the end.
How does temporary works coordination link with CDM?
Temporary works are one of the most significant risks in the construction phase. The Construction Phase Plan should set out how they are managed. The Principal Contractor must make sure suitable arrangements are in place. We link temporary works coordination with our CDM support so the plan reflects how temporary works are managed on site.
Do you provide temporary works design?
Yes. Temporary works design is available through our engineering team. We can coordinate the design brief, the design and the check together, giving you one point of contact.
Where do you provide temporary works coordination?
We are based in Liverpool and support contractors across the UK, including Liverpool, Manchester and the wider North West.
Can you provide a TWC and TWS together?
Yes. On larger or more complex projects we can provide both roles, with clear accountability at each level and consistent records throughout.
Temporary works coordination
Need a competent, independent TWC for your project?
Whether you need a TWC from day one, support on a project already underway, a review of your current arrangements or TWS support on site, we can help.