Temporary works coordination in Preston

Temporary Works Coordinator
Preston & Lancashire

An independent Temporary Works Coordinator to BS 5975 for contractors in Preston and across Lancashire.

An area we serve from our Liverpool office, around 33 miles via the M58 and M6.

Discuss a TWC appointment in Preston

0151 332 6581info@matthewsroberts.com

Temporary works coordination in Preston

An independent Temporary Works Coordinator for Preston contractors

Preston and central Lancashire bring a mix of city centre, education, housing and industrial work, each with its own temporary works priorities.

Our Temporary Works Coordinators attend Lancashire sites in person and keep every item designed, checked and permitted before use.

See our main temporary works service or everything we offer in the North West.

What we plan for in Preston

  • Segregation of temporary works from occupied areas
  • Scaffold and access design on education buildings
  • Large housing sites with many temporary works items
  • Lifting arrangements for plant and equipment

Working in Preston

Temporary works coordination consultancy in Preston

We are a temporary works coordination consultancy for contractors working in Preston. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in Preston

City centre schemes

Propping and excavation support next to existing buildings.

Education projects

Temporary works on occupied campuses with strict segregation.

Housing

Trench support, scaffolds and crane bases on large residential sites.

Industrial

Frame stability and lifting arrangements on manufacturing sites.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in Preston?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Specialist support

Related services

Insights
View all insights

FAQ

Temporary Works Coordinator Preston: questions

Do you provide a Temporary Works Coordinator in Preston and Lancashire?

Yes. We support contractors across Preston and central Lancashire from our Liverpool office.

Can you work on occupied education sites?

Yes. We plan temporary works around segregation, safeguarding and term times on occupied campuses.

Can you take over temporary works on a Preston project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in Preston?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.