Temporary works coordination in Salford

Temporary Works Coordinator
Salford

An independent Temporary Works Coordinator to BS 5975 for contractors in Salford, including Salford Quays and MediaCityUK.

An area we serve from our Liverpool office, around 32 miles along the M62.

Discuss a TWC appointment in Salford

0151 332 6581info@matthewsroberts.com

Temporary works coordination in Salford

An independent Temporary Works Coordinator for Salford contractors

Many Salford schemes sit close to the Quays, the Irwell and the Manchester Ship Canal, where excavation support, cofferdams and piling platforms carry real risk.

Our Temporary Works Coordinators make sure every item has a proper design brief, the right level of check and a permit before it is loaded.

See our main temporary works service or everything we offer in Salford.

What we plan for in Salford

  • Groundwater and water level changes next to the Quays and waterways
  • Working platform design for heavy piling rigs
  • Neighbouring live developments sharing site boundaries
  • Public access routes around regeneration areas

Working in Salford

Temporary works coordination consultancy in Salford

We are a temporary works coordination consultancy for contractors working in Salford. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in Salford

Excavations near water

Sheet piles, cofferdams and dewatering where groundwater and water levels affect stability.

Piling platforms

Working platforms for piling rigs designed and checked before use.

Residential towers

Falsework, back propping and crane bases on apartment schemes.

Public realm works

Temporary works protecting the public around busy regeneration areas.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in Salford?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Coordinator Salford: questions

Do you provide a Temporary Works Coordinator in Salford?

Yes. We support contractors across Salford, including Salford Quays and MediaCityUK, from our Liverpool office.

Do working platforms need a temporary works design?

Yes. Piling and crane working platforms are temporary works. They need a design, an appropriate check, inspection against the design and a permit before use.

Can you take over temporary works on a Salford project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in Salford?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com