LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
Temporary works to BS 5975
Scaffolds managed as temporary works: TG20 compliance or bespoke design, checks, handover, inspection and controlled alteration.
Based in Liverpool. Supporting contractors across the North West and the UK.
Discuss a TWC appointmentWhat we do
Scaffolds are the most common temporary works on most sites. They are also among the most frequently altered without approval.
We bring scaffolds into the temporary works procedure, from confirming whether a design is needed to controlling handover, inspections and changes.
See our main temporary works service.
What we keep on top of
What it covers
Confirming TG20 compliance or the need for a bespoke scaffold design.
Bespoke scaffolds, loading bays and gantries designed and checked.
Handover certificates and inspections at the required intervals.
No changes without review by the scaffold designer and TWC.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need help with scaffolding temporary works?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Specialist support
Free downloads
Temporary works are far more common than many contractors realise. Here are the most common examples and why each one needs managing.
Read insightEvery temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightBS 5975 is the British Standard for controlling temporary works in the UK. This guide explains the current 2024 edition, the roles it sets out, design check categories 0 to 3, the register and the permit system.
Read insightFAQ
Yes. Scaffolds are temporary works and should be on the temporary works register with their design basis, handover and inspections recorded.
When it falls outside the standard configurations in industry guidance such as TG20 for tube and fitting scaffolds, or outside the manufacturer's guidance for system scaffolds.
The Work at Height Regulations 2005 require inspection after installation, at intervals of no more than seven days and after any event likely to have affected stability.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.