Key facts
- Our role
- Site and Construction Management
- Sector
- Housing & Residential
- Status
- Complete
- Dates
- 2021 to 2023
- Value
- £5m to £10m
Overview
The Stamford Arms redevelopment regenerated a vacant village pub and former stable buildings in Little Bollington, near Altrincham, into homes alongside new build dwellings. Published planning reporting described an 18 home scheme of nine apartments, five mews cottages and four new houses, with the heritage restoration carried out in consultation with the National Trust and local stakeholders.
Site and Construction Management Scope
Site leadership
Sole site based management of the phased redevelopment, overseeing subcontractors and direct labour.
Procurement and resourcing
Procurement, supplier management, workforce resourcing and short term programmes.
Groundworks and structure
Deep drainage, foundations, slabs and external works around the retained heritage buildings.
Safety, temporary works and quality
Management of RAMS, temporary works and quality assurance throughout.
Cost control
Control of expenditure and variations.
Approach
Heritage fabric cannot be replaced like for like, so every intervention was planned before work started. Temporary works protected the retained structures, the sequence kept the constrained village site safe and accessible and the phasing allowed each part of the scheme to be finished properly before the next began.
Outcome
The redevelopment brought the vacant pub and stables back into use as homes, alongside new build dwellings that complete the scheme.
Matthews & Roberts provides project management and temporary works support on residential and heritage schemes across Cheshire and the North West. See our housing and residential work.
Working on a Cheshire scheme? See our construction project management in Chester and Cheshire service.
Frequently asked questions
What are the main challenges of converting a heritage pub into homes?
Older structures need careful investigation and temporary support during alterations, the character of the building must be protected and new services, drainage and foundations have to work around fabric that cannot be replaced like for like.
Why are heritage schemes often delivered in phases?
Phasing lets the retained buildings and new build elements progress in a controlled order, manages access on constrained village sites and allows each area to be completed and protected before the next begins.
Contract administration
Guides and templates for this kind of work
Notices, programme and change all affect each other. These cover the related steps.
Guides
- NEC4 Compensation Events: A Contractor's Guide to Notifying, Quoting and RecoveringNotifying and valuing compensation events under clause 60.
- NEC4 Early Warnings: A Contractor's Guide to Clause 15 and the Early Warning RegisterRaising early warnings under clause 15 and running the register.
- NEC4 Accepted Programme: What Clause 31 Requires and Why It Protects the ContractorGetting the programme accepted and keeping it current.