Temporary works to BS 5975

Temporary Works Audit
North West

An independent review of your temporary works procedure, register, designs, checks and permits against BS 5975, with clear actions to close any gaps.

Based in Liverpool. Supporting contractors across the North West and the UK.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Temporary Works Audit

A temporary works audit tells you whether your procedure is working on site, not just on paper. It is useful before a major project, after an incident or as routine assurance.

We review the documents, walk the site and give you a clear, prioritised action list.

See our main temporary works service.

What we keep on top of

  • Gaps between the written procedure and what happens on site
  • Items in use without a permit to load
  • Design checks at the wrong category
  • Out of date registers after programme changes

What it covers

Temporary Works Audit: what we cover

Procedure review

Your company temporary works procedure checked against BS 5975.

Register and records

Completeness of the register, briefs, check certificates and permits.

Site verification

Installed items compared with their approved designs.

Competence and appointments

Designated Individual, TWC and TWS appointments and training.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with temporary works audit?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Audit: questions

What does a temporary works audit cover?

The procedure, appointments, register, design briefs, check certificates, permits and a site inspection of installed items against their designs.

How long does an audit take?

It depends on the size of the project. A single site audit typically involves a document review and one site visit, followed by a written report.

Do you help close the actions?

Yes. We can support your team to close the actions or provide a TWC to run the procedure going forward.

Temporary works

Need support with temporary works audit?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.