Temporary works to BS 5975

Facade Retention
Temporary Works

Coordination of facade retention schemes on heritage and city centre buildings, from survey and design through check, monitoring and transfer to the new frame.

Based in Liverpool. Supporting heritage schemes across Liverpool, Manchester, Chester and the North West.

Discuss a TWC appointment

0151 332 6581info@matthewsroberts.com

What we do

Facade Retention

Retaining a historic facade while the building behind it is demolished and rebuilt is one of the highest risk temporary works operations in construction.

We coordinate the survey, design, independent check, monitoring and sequence so the facade stays stable from first cut to final tie in.

See our main temporary works service.

What we keep on top of

  • Heritage and planning conditions on the facade
  • Highway licences for external structures
  • Wind loading on a free standing facade
  • Foundations for the retention structure

What it covers

Facade Retention: what we cover

Condition survey

Facade condition, ties and existing structure recorded before design.

Design and check

Retention schemes treated as high category designs with independent checks.

Monitoring

Movement monitoring with agreed trigger levels and actions.

Sequence and transfer

Demolition, new frame and tie in sequenced with permits at each stage.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need help with facade retention?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Facade Retention: questions

What is facade retention?

Facade retention keeps the front or external walls of an existing building in place while the structure behind is demolished and rebuilt, using a temporary support structure until the new frame takes over.

What check category applies to facade retention?

Facade retention schemes are usually complex enough to need a high check category, often Category 3 with an independent check by a separate organisation.

Is there guidance for facade retention?

CIRIA guidance C579 on the retention of masonry facades is widely used alongside BS 5975.

Temporary works

Need support with facade retention?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections