Temporary works to BS 5975
Controlled sign off before temporary works are loaded and before they are removed, backed by inspection against the approved design.
Based in Liverpool. Supporting contractors across the North West and the UK.
Discuss a TWC appointmentWhat we do
Most temporary works failures happen at two moments: when an item is first loaded and when it is removed. Permits to load and strike exist to control both.
We inspect installations against the approved design, issue permits only when the item is ready and make sure nothing is struck before the permanent works can carry the load.
See our main temporary works service.
What we keep on top of
What it covers
Installation checked against the drawings, design and check certificate.
Issued only when the item is complete, inspected and ready for use.
Issued only when the permanent works can safely take the load.
Permits linked to the temporary works register for a full audit trail.
Scope
Standards and regulations
The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.
Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).
Scaffolds, edge protection and access platforms designed, inspected and recorded.
Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.
Need help with permits to load and strike?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Everything the designer needs in one brief.
Across the North West & North Wales
Specialist support
Free downloads
Most temporary works incidents happen when items are first loaded or removed. Here is how permits to load and strike control both moments.
Read insightTWC and TWS are often confused. Here is how the two BS 5975 roles differ, how they work together and when a project needs both.
Read insightBS 5975 is the British Standard for controlling temporary works in the UK. This guide explains the current 2024 edition, the roles it sets out, design check categories 0 to 3, the register and the permit system.
Read insightFAQ
A formal sign off by the Temporary Works Coordinator, or someone authorised by them, confirming that a temporary works item has been installed to the approved design and inspected, so it can be loaded.
A formal sign off confirming that a temporary works item can be removed because the permanent works, or another arrangement, can now safely carry the load.
The Temporary Works Coordinator, or a Temporary Works Supervisor where the TWC has authorised them in writing.
Temporary works
Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.