Temporary works coordination in Stockport

Temporary Works Coordinator
Stockport

An independent Temporary Works Coordinator to BS 5975 for contractors on Stockport town centre and regeneration schemes.

An area we serve from our Liverpool office, around 40 miles along the M62 and M60.

Discuss a TWC appointment in Stockport

0151 332 6581info@matthewsroberts.com

Temporary works coordination in Stockport

An independent Temporary Works Coordinator for Stockport contractors

Stockport's town centre regeneration places new buildings beside older structures, railways and busy roads, so temporary works often protect more than the site itself.

We provide a Temporary Works Coordinator who keeps every item designed, checked and permitted, with attention to the interfaces around the site boundary.

See our main temporary works service or everything we offer in Stockport.

What we plan for in Stockport

  • Older neighbouring buildings with unknown foundations
  • Rail and highway interfaces near the town centre
  • Limited space for propping and plant on compact sites
  • Public protection around regeneration works

Working in Stockport

Temporary works coordination consultancy in Stockport

We are a temporary works coordination consultancy for contractors working in Stockport. We provide an independent temporary works coordinator who runs the BS 5975 procedure on your site, from the register and design briefs to independent checks and permits to load and strike.

We also support your temporary works supervisors, audit existing procedures and arrange temporary works design through our engineering partners. That suits contractors who need a coordinator for one project as well as those who want support across several sites.

Typical work

Temporary works we coordinate in Stockport

Works next to existing buildings

Propping, needling and monitoring where new work meets older structures.

Residential frames

Falsework and back propping on apartment schemes.

Excavation support

Shoring and sheet piles on compact town centre plots.

Hoardings and access

Hoardings, scaffolds and gantries next to public routes.

Scope

What our Temporary Works Coordinators do

Procedure
A project temporary works procedure aligned with BS 5975 and your company procedure.
Register
One live register of every item, its designer, check category, status and permits.
Design briefs
Briefs setting out loads, constraints, ground information and interfaces for each designer.
Design checks
Check categories agreed and independent checks arranged before construction.
Inspection
Installations inspected against the approved design before any permit is issued.
Permits
Permits to load and permits to strike controlled so nothing is used or removed early.
Change
A controlled route for any change to an approved design.
Supervisors
Temporary Works Supervisors briefed and coordinated across every package.

Standards and regulations

What the work is based on

  • BS 5975

    The code of practice for temporary works procedures (Part 1) and falsework design (Part 2). The 2024 edition supersedes BS 5975:2019.

  • CDM 2015

    Duties to keep structures stable during construction (regulation 19) and to make excavations safe (regulation 22).

  • Work at Height Regulations 2005

    Scaffolds, edge protection and access platforms designed, inspected and recorded.

  • TWC appointment checklist

    Our free checklist for appointing a Temporary Works Coordinator, with a printable PDF.

Need a Temporary Works Coordinator in Stockport?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 9 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Coordinator Stockport: questions

Do you provide a Temporary Works Coordinator in Stockport?

Yes. We support contractors across Stockport and south east Greater Manchester from our Liverpool office.

How do you manage temporary works next to older buildings?

We survey the existing structures, design support and monitoring with trigger levels and control installation and removal through the permit system.

Can you take over temporary works on a Stockport project already under way?

Yes. We review the existing register, designs, checks and permits, close any gaps and then run the procedure from that point forward.

Temporary works

Need a Temporary Works Coordinator in Stockport?

Tell us about your site and the temporary works planned. We will come back to you with a clear proposal for a TWC appointment.

  • BS 5975 procedure
  • Temporary works register
  • Design briefs and checks
  • Permits to load and strike
  • Site inspections

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.