Temporary works are anything built to enable, support, protect or provide access to the permanent works during construction. Many stay in place for weeks or months. Some become part of the permanent works. All of them need managing.
Common examples
| Category | Examples |
|---|---|
| Access | Scaffolds, mast climbers, stair towers, edge protection |
| Ground support | Trench boxes, sheet piles, cofferdams, battered excavations |
| Structural support | Falsework, formwork, back propping, needling, shoring |
| Retention | Facade retention, support to adjacent buildings |
| Plant and lifting | Crane bases, hoist bases, piling mats, working platforms |
| Protection | Hoardings, fans, crash decks, protection screens |
| Stability | Temporary bracing of steel frames, wind posts during construction |
Access
- Examples
- Scaffolds, mast climbers, stair towers, edge protection
Ground support
- Examples
- Trench boxes, sheet piles, cofferdams, battered excavations
Structural support
- Examples
- Falsework, formwork, back propping, needling, shoring
Retention
- Examples
- Facade retention, support to adjacent buildings
Plant and lifting
- Examples
- Crane bases, hoist bases, piling mats, working platforms
Protection
- Examples
- Hoardings, fans, crash decks, protection screens
Stability
- Examples
- Temporary bracing of steel frames, wind posts during construction
Why it matters
Temporary works failures can cause collapse, injury and serious damage to neighbouring property. CDM 2015 requires structures to be kept stable during construction. BS 5975 provides the procedure to make sure each item is designed, checked, installed and removed safely.
Examples people miss
- Piling mats and working platforms, which support very heavy plant
- Hoardings, which must resist wind loads
- Temporary stability of steel frames before the permanent bracing is in
- Spoil heaps and stockpiles next to excavations
- Loading bays on scaffolds
Getting them on the register
Every item should go on the temporary works register before work starts. Read what a Temporary Works Coordinator does and our guides to scaffolding temporary works and excavation support.
Support across the North West
Matthews & Roberts provides Temporary Works Coordinators to contractors in Liverpool, Manchester, Chester, Warrington and across the North West.
Frequently asked questions
What is the definition of temporary works?
Temporary works are the parts of the works that allow or enable construction of, protect, support or provide access to the permanent works and which might or might not remain in place at the end of the works.
Is a hoarding temporary works?
Yes. Hoardings must resist wind and impact and are temporary works that should be on the register.
Are crane bases temporary works?
Yes. Tower crane bases and ties are temporary works and usually need a design and a high check category.
Temporary works
Related guides and templates
Temporary works procedures link together. These guides and templates cover the rest of the process.
Guides
- BS 5975 Explained: The Contractor's Guide to Temporary Works ProceduresThe code of practice behind every temporary works procedure.
- Excavation Support Temporary Works: Trench Boxes, Sheet Piles and InspectionsTrench and excavation support from design to inspection.
- Facade Retention Temporary Works: How Historic Facades Are Kept StableRetaining a facade safely while the building behind is rebuilt.
- Temporary Works Coordination: Best Practice GuidanceEffective temporary works management is critical to construction safety. Learn the key principles and how proper...
Free templates
- Temporary Works Register TemplateExcel register with categories, checks and permits.Free · Excel and PDF
- Temporary Works Coordinator Appointment ChecklistCompetence, appointment and systems checks for a TWC.Free · Word and PDF
- Permit to Load & Permit to Strike TemplatesPermit forms ready to issue on site.Free · Word and PDF
Need support with temporary works on your project?