A Temporary Works Supervisor (TWS) supervises the day to day installation, use, adaptation and removal of temporary works so they match the checked design. The TWS reports to the Temporary Works Coordinator. The TWC runs the procedure; the TWS makes sure it happens correctly on the ground.
Main responsibilities
| Responsibility | In practice |
|---|---|
| Installation | Works installed to the design, drawings and method statement |
| Inspection | Checks before loading and during use, with records |
| Permits | Completing pre load and pre strike checks for permits |
| Communication | Briefing the team and reporting issues to the TWC |
| Changes | Stopping work if the site does not match the design |
Installation
- In practice
- Works installed to the design, drawings and method statement
Inspection
- In practice
- Checks before loading and during use, with records
Permits
- In practice
- Completing pre load and pre strike checks for permits
Communication
- In practice
- Briefing the team and reporting issues to the TWC
Changes
- In practice
- Stopping work if the site does not match the design
TWS or TWC?
The TWC coordinates all temporary works on the project, including design briefs, checks and the register. The TWS focuses on specific works on site. Our guide to the TWC and TWS compares the roles in detail.
When is a TWS needed?
On larger or more complex projects, or where works are spread across several areas, the TWC may appoint one or more supervisors. The appointment should be in writing, with the scope and any delegated authority set out.
Training and competence
Supervisors need experience of the types of temporary works they oversee and usually a recognised TWS course. See TWC and TWS training.
Temporary Works Supervisors in the North West
Matthews & Roberts provides Temporary Works Supervisors and Coordinators for contractors in Liverpool, Manchester, Chester and North Wales. Download our free permit to load and strike templates. Call 0151 332 6581 or email info@matthewsroberts.com.
Frequently asked questions
What does a Temporary Works Supervisor do?
Supervises the installation, use, adaptation and removal of temporary works in line with the design, carries out inspections and reports to the Temporary Works Coordinator.
Is a Temporary Works Supervisor always needed?
Not on every project. The TWC decides, based on the size and complexity of the temporary works, whether one or more supervisors are needed.
Can a TWS issue a permit to load?
Where the contractor's procedure allows and the TWC has delegated it in writing, a TWS can issue permits. Many procedures keep that authority with the TWC.
Temporary works
Related guides and templates
Temporary works procedures link together. These guides and templates cover the rest of the process.
Guides
- BS 5975 Explained: The Contractor's Guide to Temporary Works ProceduresThe code of practice behind every temporary works procedure.
- Temporary Works Design Brief: What to IncludeWriting a brief the designer can work from.
- Who Can Design Temporary Works? Designers, Checkers and CompetenceCompetence for temporary works designers.
- What Counts as Temporary Works? Examples on Construction SitesCommon items that need to be on the register.
Free templates
- Temporary Works Register TemplateExcel register with categories, checks and permits.Free · Excel and PDF
- Temporary Works Coordinator Appointment ChecklistCompetence, appointment and systems checks for a TWC.Free · Word and PDF
- Permit to Load & Permit to Strike TemplatesPermit forms ready to issue on site.Free · Word and PDF
Need support with temporary works on your project?