Temporary Works

What Does a Temporary Works Coordinator Do?

The Temporary Works Coordinator manages every temporary works item on a project from first identification to removal. Here is what the role covers.

Matthews & Roberts1 min read
Tower crane and city construction site where a Temporary Works Coordinator is appointed
On this page
  1. The TWC's main duties
  2. Who the TWC works with
  3. What makes a good TWC
  4. Independent TWCs in the North West

A Temporary Works Coordinator manages every temporary works item on a project from first identification to final removal. The TWC keeps the register, briefs designers, makes sure designs are checked to the right category, inspects installations and controls permits to load and strike. The role is set out in BS 5975.

The TWC's main duties

  • Identify temporary works from the programme, drawings and method statements before work starts
  • Maintain the temporary works register so every item has an owner and a status
  • Prepare design briefs setting out loads, constraints, ground information and interfaces
  • Agree the design check category and make sure the check is done
  • Coordinate designers and suppliers so designs fit together and with the permanent works
  • Inspect installations against the approved design
  • Issue permits to load and strike
  • Brief and appoint Temporary Works Supervisors where needed

Who the TWC works with

The TWC is appointed by the organisation's Designated Individual and works with designers, design checkers, supervisors, package managers and the Principal Contractor's team. Read who is responsible for temporary works.

What makes a good TWC

Construction experience on similar work, recognised training, authority to stop work and enough time on site to actually inspect. Our appointment checklist sets out what to check before you appoint. See also TWC training courses.

Independent TWCs in the North West

Matthews & Roberts provides independent Temporary Works Coordinators to contractors in Liverpool, Manchester, Chester, Warrington and across the North West. See our £2bn industrial scheme in Chester and Tatton Services M56 case studies.

Frequently asked questions

What does a Temporary Works Coordinator do?

The TWC manages the temporary works procedure on a project. That includes keeping the register, preparing design briefs, agreeing check categories, making sure designs are checked, inspecting installations and issuing permits to load and strike.

Who appoints the Temporary Works Coordinator?

The TWC is appointed by the organisation responsible for the temporary works, usually through its Designated Individual. On most projects that is the Principal Contractor or a contractor carrying out the work.

Is a Temporary Works Coordinator a legal requirement?

The law requires temporary works to be designed, installed and maintained safely. BS 5975 recommends appointing a TWC as the way to do that, and most clients and main contractors require one.

Temporary works

Related guides and templates

Temporary works procedures link together. These guides and templates cover the rest of the process.

Need support with temporary works on your project?

More insights

View all insights