Temporary Works Coordination on a £2bn Industrial Scheme in Chester
Chester, Cheshire
Temporary works design in Preston
Temporary works design and independent design checks through our engineering partners for contractors in Preston and Lancashire. Propping, excavation support, falsework and facade retention.
An area we serve from our Liverpool office, around 33 miles via the M58 and M6.
Discuss temporary works design in PrestonTemporary works design in Preston
Temporary works on projects in Preston and Lancashire cover the full range, from city centre regeneration, university and college campuses, large housing sites plus manufacturing along the M6 and M55. Each design has to reflect the ground, the loads and the way the site will actually build.
We arrange temporary works design and independent checks at the right category through our engineering partners and coordinate them through your temporary works procedure. Preston is around 33 miles from our Liverpool office via the M58 and M6.
See our main temporary works design service or everything we offer in the North West.
What we plan for in Preston
Working in Preston
Matthews & Roberts works as a temporary works design consultancy for contractors in Preston, arranging designs and independent checks through our engineering partners. We cover propping, excavation support, falsework, formwork and facade retention.
Because we also provide temporary works coordinators, each design is briefed properly, checked at the right category and controlled on site through permits to load and strike.
Typical work
Temporary support for existing structures during alteration and demolition.
Trench support, sheet piles and propped excavations designed from ground data.
Designs for slabs, walls and structures.
Checks at the category BS 5975 sets for the risk.
Scope
Standards
The code of practice for temporary works procedures.
Categories 0 to 3 explained.
What a good design brief includes.
Need temporary works design in Preston?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Check subcontractor RAMS before work starts.
Across the North West & North Wales
Also in Preston & Lancashire
Specialist support
Free downloads
Most temporary works design problems start with a poor brief. Here is what a good one includes.
Read insightNot every temporary works design needs a specialist engineer, but every design needs a competent designer and a suitable check.
Read insightEvery temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightFAQ
Yes. We arrange temporary works design and independent checks for contractors across Preston and Lancashire through our engineering partners. Preston is around 33 miles from our Liverpool office via the M58 and M6.
BS 5975 sets categories 0 to 3 based on complexity and risk. Category 2 needs a checker from outside the design team and category 3 needs an independent organisation.
Yes. Our temporary works team provides coordinators to run the procedure on site.
Temporary works design
Tell us about your project and what you need. We will come back within one working day with a clear proposal and a named consultant.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.