Free template · Temporary works

Excavation Inspection Register Template

A free Excel register for recording excavation inspections at the start of every shift and after any event that could affect stability.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the Excavation inspection register

About this template

What the Excavation inspection register is for

Excavations must be inspected by a competent person at the start of every shift in which work is done and after any event likely to affect their stability. Each inspection needs a record.

This register gives every excavation a clear inspection history, linked to its temporary works design and register entry.

What is included

  • Excavation reference, support system and competent person
  • 60 inspection rows with drop down inspection types
  • Condition checks for support, edges, access, water, services and spoil
  • Safe to work decision with actions
  • Guidance tab on inspection frequency

How to use it

Using the Excavation inspection register on your project

  1. 01

    Set up each excavation

    Create a register for each excavation and link it to the temporary works register.

  2. 02

    Inspect every shift

    Inspect before work starts on every shift and record the result.

  3. 03

    Inspect after events

    Inspect again after heavy rain, a collapse or anything that could affect stability.

  4. 04

    Act on findings

    Stop work where it is not safe and record the actions before restarting.

Avoid these

Common mistakes we see on site

  • Inspections recorded once a week instead of every shift
  • No inspection after heavy rain
  • Spoil and plant left too close to the edge
  • Excavations not linked to their temporary works design

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

Excavation Inspection Register Template: questions

How often should excavations be inspected?

At the start of every shift in which work is done and after any event likely to affect strength or stability, such as heavy rain or a fall of material.

Who can inspect an excavation?

A competent person with the training and experience to recognise defects in the excavation and its support.

Do excavations need a temporary works design?

Excavation support is temporary works and should be managed through the temporary works procedure, with a design where needed.

Can you manage excavation support on our site?

Yes. We coordinate excavation support design, checks and inspections for contractors.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.