What Counts as Temporary Works? Examples on Construction Sites
Temporary works are far more common than many contractors realise. Here are the most common examples and why each one needs managing.
Read insightFree template · Temporary works
A free Excel register for recording scaffold inspections after erection, every seven days and after any event that could affect safety.
Free to download, no sign up. White labelled so you can add your own company name and logo.
Need help using it?0151 332 6581info@matthewsroberts.com

About this template
Scaffolds must be inspected by a competent person after erection, at least every seven days and after anything that could affect their safety. Each inspection needs a record.
This register keeps every scaffold's inspection history in one place, linked to its design and temporary works register entry.
What is included
Temporary works
Temporary works procedures link together. These guides and templates cover the rest of the process.
Guides
Free templates
Where we have delivered this
Prefer us to run it for you? Temporary Works
How to use it
Create an entry for each scaffold and link it to the temporary works register.
Record the handover inspection before first use.
Record each weekly inspection and after any alteration or event.
Take the scaffold out of use until defects are put right.
Avoid these
Prefer us to handle it?
Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.
Send us a messageRelated services
Temporary works are far more common than many contractors realise. Here are the most common examples and why each one needs managing.
Read insightTWC and TWS are often confused. Here is how the two BS 5975 roles differ, how they work together and when a project needs both.
Read insightSite inspections are how contractors find out whether their health and safety arrangements are working. This guide separates the inspections the law requires from the monitoring a Principal Contractor should carry out. It also explains what a good construction site inspection covers.
Read insightFree resources
FAQ
After erection, at intervals not exceeding seven days and after any event likely to affect safety, such as high winds or alterations.
A competent person with the training and experience for the type of scaffold, for example a CISRS qualified inspector.
Yes. Scaffolds are temporary works and designed scaffolds should be on the temporary works register.
Yes. We coordinate scaffold design, checks and inspections as part of temporary works coordination.
Talk to us
Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.
Email info@matthewsroberts.com
3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR