Pre Construction Information Under CDM 2015: What to Include
Pre construction information tells designers and contractors what they need to plan for. Here is what it should include.
Read insightFree template · Health and safety
A free checklist of the pre construction information a client should provide under CDM 2015, from surveys and services to significant design risks.
Free to download, no sign up. White labelled so you can add your own company name and logo.
Need help using it?0151 332 6581info@matthewsroberts.com

About this template
Under CDM 2015 the client must provide pre construction information to designers and contractors as early as possible. Gaps in the PCI often become delays and cost on site.
This checklist covers the information that is usually needed, so nothing important is missed before design and tendering.
What is included
CDM and site safety
CDM duties connect from planning to handover. These cover the related documents and checks.
Guides
Free templates
Where we have delivered this
Prefer us to run it for you? Health & Safety
How to use it
Gather the PCI at the start of design.
Work through the checklist and note where information is missing.
Commission surveys for anything that is missing.
Share the PCI with designers and contractors bidding for the work.
Avoid these
Prefer us to handle it?
Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.
Send us a messageRelated services
Pre construction information tells designers and contractors what they need to plan for. Here is what it should include.
Read insightThe Principal Designer coordinates health and safety through design. Here is what the role involves under CDM 2015.
Read insightClients carry legal duties under CDM 2015. This guide explains who counts as a client, what the duties are and how to meet them in practice.
Read insightFree resources
FAQ
The client, with help from the Principal Designer, under CDM 2015.
As soon as practicable, so designers and contractors can plan the work.
Risks can be missed in design and pricing, leading to delay, cost and unsafe conditions.
Yes. We act as Principal Designer and CDM adviser for clients and contractors.
Talk to us
Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.
Email info@matthewsroberts.com
3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR