The Health and Safety File: What Goes In It and Who Is Responsible
The Health and Safety File is often rushed at the end of a project. Here is what it should contain and how to build it as you go.
Read insightFree template · Health and safety
A free checklist for compiling the CDM 2015 health and safety file, so the client receives what they need to work on the building safely in future.
Free to download, no sign up. White labelled so you can add your own company name and logo.
Need help using it?0151 332 6581info@matthewsroberts.com

About this template
The health and safety file holds the information needed to clean, maintain, alter or demolish the building safely. It should be built up during the project, not assembled in a rush at handover.
This checklist covers the contents set out in the CDM 2015 guidance and the handover steps.
What is included
CDM and site safety
CDM duties connect from planning to handover. These cover the related documents and checks.
Guides
Free templates
Where we have delivered this
Prefer us to run it for you? Health & Safety
How to use it
Agree the structure with the Principal Designer early.
Gather contractor information as each package completes.
Check the file is complete and easy to use.
Pass the file to the client and record receipt.
Avoid these
Prefer us to handle it?
Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.
Send us a messageRelated services
The Health and Safety File is often rushed at the end of a project. Here is what it should contain and how to build it as you go.
Read insightA messy handover undoes months of good work. Here is how to plan snagging and handover properly.
Read insightThe Principal Designer coordinates health and safety through design. Here is what the role involves under CDM 2015.
Read insightFree resources
FAQ
The Principal Designer, with information from the Principal Contractor and others. It is handed to the client at the end of the project.
Information needed to carry out future work safely, such as residual hazards, structural principles, hazardous materials and services.
No. They can be combined, but the file focuses on health and safety information for future work.
Yes. We support Principal Designers and contractors with health and safety file preparation.
Talk to us
Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.
Email info@matthewsroberts.com
3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR