Bill of Quantities Template
A free Excel bill of quantities set out by NRM2 work section. Quantities multiply by rates automatically, with preliminaries, overheads and contingency at the foot.
Free to download, no sign up. White labelled so you can add your own company name and logo.
Need help using it?0151 332 6581info@matthewsroberts.com

About this template
What the Bill of quantities template is for
A bill of quantities sets out the measured work in a consistent order so it can be priced, valued and compared. NRM2 gives the rules for how it is measured and arranged.
This template gives you a clean bill with automatic totals. Use the same item references when you value work, log variations and agree the final account.
What is included
- Project and bill details block
- 60 item rows with NRM2 work section column
- Unit drop down and automatic line totals
- Preliminaries, overheads and profit and contingency
- Bill total calculated automatically
- Guidance tab
Commercial control
Use the Bill of quantities template alongside these
A commercial review draws on more than one record. These guides and templates support it.
Guides
- Cost Value Reconciliation in Construction: A Contractor's Guide to CVRHow to compare cost with value and report the margin honestly.
- What Is a Bill of Quantities and What Is NRM2?How the bill is measured under NRM2 and used to price and value work.
- How Are Construction Variations Valued? A Guide for ContractorsValuing change under the contract so it lands in the CVR.
Free templates
- Variation and Change Register TemplateEvery change logged with values that feed the CVR.Free · Excel and PDF
- Interim Payment Application TemplateValue, retention and amount due calculated for you.Free · Excel and PDF
- Construction Final Account TemplateContract sum to balance due, submitted against agreed.Free · Excel and PDF
Prefer us to run it for you? Commercial & Cost Management
How to use it
Using the Bill of quantities template on your project
- 01
Set the structure
Arrange items by NRM2 work section with a unique reference for each.
- 02
Measure
Enter quantities measured from the drawings to the NRM2 rules.
- 03
Price
Add rates. The line totals and bill total calculate automatically.
- 04
Carry it through
Use the same references for valuations, variations and the final account.
Avoid these
Common mistakes we see on site
- Items that do not follow a consistent measurement method
- Preliminaries left out of the total
- Descriptions too vague to price or value
- Different references used later for valuations
Prefer us to handle it?
We can run this for you on site
Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.
Send us a messageRelated services
Services that go with this template
Free resources
More free construction templates
FAQ
Bill of Quantities Template: questions
What is a bill of quantities?
A document listing the measured items of work on a project with their quantities, so contractors can price the work on the same basis.
What is NRM2?
The RICS New Rules of Measurement for detailed measurement of building works. It sets how items are measured and described in a bill.
Does the template calculate totals?
Yes. Quantity multiplied by rate gives each line total. The bill total adds measured work, preliminaries, overheads and contingency.
Can you measure and price a bill for us?
Yes. Our quantity surveyors provide measurement and take offs for contractors and subcontractors.
Talk to us
Need support on your project?
Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.
Email info@matthewsroberts.com
3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR