Free template · Health and safety

Construction Site Safety Inspection Checklist

A free checklist for weekly or periodic construction site safety inspections, with sections for set up, access, work at height, excavations, plant, lifting and health, plus an action log.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the Site safety inspection checklist

About this template

What the Site safety inspection checklist is for

Regular inspections catch problems before they become incidents. They also give the client and the Principal Contractor evidence that the site is being monitored.

This checklist covers the areas most often found wanting on construction sites and ends with an action log so every finding has an owner and a date.

What is included

  • Site set up and welfare
  • Access and housekeeping
  • Work at height
  • Excavations and temporary works
  • Plant and lifting
  • Health hazards
  • Action log and sign off

How to use it

Using the Site safety inspection checklist on your project

  1. 01

    Walk the whole site

    Inspect every area, not just the active work faces.

  2. 02

    Record what you see

    Mark each check and note the detail.

  3. 03

    Assign actions

    Give every finding an owner and a due date.

  4. 04

    Close out

    Check actions are closed at the next inspection.

Avoid these

Common mistakes we see on site

  • Inspections that only record problems, not actions
  • Actions with no owner or date
  • The same findings repeated week after week
  • Inspections that skip welfare and storage areas

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

Construction Site Safety Inspection Checklist: questions

How often should a construction site be inspected?

Many contractors carry out weekly safety inspections, with statutory inspections such as scaffolds and excavations at the intervals the regulations set.

Who should carry out site safety inspections?

The site manager, supported by a competent health and safety adviser for independent inspections.

Do you carry out site safety inspections?

Yes. Our consultants carry out inspections and audits on sites across the North West and North Wales.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.