Free template · Project management

Inspection and Test Plan Template

A free Excel ITP for any work package. List each stage, its inspection or test, the acceptance criteria and whether it is a hold or witness point.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the Inspection and test plan template

About this template

What the Inspection and test plan template is for

An inspection and test plan sets out how the quality of a work package will be checked as it is built. It agrees the inspections, tests and sign off points before work starts.

This template gives you a standard ITP for any package, with hold and witness points and a record of each certificate.

What is included

  • Package, contractor and specification details
  • 40 numbered activity rows
  • Inspection or test, acceptance criteria and specification clause
  • Point type drop down: hold, witness, review, surveillance
  • Contractor and client sign off columns
  • Record or certificate reference for handover

How to use it

Using the Inspection and test plan template on your project

  1. 01

    List the stages

    Set out each stage of the work in the order it is built.

  2. 02

    Set the checks

    Add the inspection or test and the acceptance criteria from the specification.

  3. 03

    Agree the points

    Agree hold and witness points with the client before work starts.

  4. 04

    Sign and file

    Sign each line as it is completed and file the records for handover.

Avoid these

Common mistakes we see on site

  • ITPs written after the work has started
  • Acceptance criteria with no specification reference
  • Hold points passed without sign off
  • Records missing at handover

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

Inspection and Test Plan Template: questions

What is an inspection and test plan?

A document listing the inspections and tests for a work package, the acceptance criteria and who signs each one off.

What is a hold point?

A stage where work must stop until the inspection is carried out and signed off.

What is a witness point?

A stage where the client is given notice to attend the inspection. Work may continue if they do not attend.

Can you set up quality assurance on our project?

Yes. We set up ITPs, inspections and handover records for contractors.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.