Free template · Health and safety

RAMS Review Checklist

A free checklist for reviewing subcontractor risk assessments and method statements before work starts, covering scope, hazards, people, plant, emergencies and communication.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the RAMS review checklist

About this template

What the RAMS review checklist is for

Generic RAMS are one of the most common findings on site safety audits. A good review checks the RAMS describe the actual work, in the actual location, with controls the team will really use.

This checklist gives reviewers a consistent set of questions and a clear outcome: accepted, accepted with comments or rejected for resubmission.

What is included

  • Scope and sequence checks
  • Hazards and controls, including temporary works and permits
  • People, competence, plant and PPE
  • Emergency and environmental arrangements
  • Briefing and interfaces
  • Outcome and sign off

How to use it

Using the RAMS review checklist on your project

  1. 01

    Request early

    Ask for RAMS well before the start date so there is time to review.

  2. 02

    Review against the site

    Check them against the programme, drawings and site constraints.

  3. 03

    Record the outcome

    Accept, comment or reject with clear reasons.

  4. 04

    Brief and monitor

    Make sure the accepted RAMS are briefed and followed on site.

Avoid these

Common mistakes we see on site

  • Accepting generic RAMS without site detail
  • No link to permits or temporary works
  • RAMS reviewed but never briefed
  • No review when the work changes

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

RAMS Review Checklist: questions

What does RAMS stand for?

Risk assessment and method statement. The risk assessment identifies hazards and controls, the method statement sets out how the work will be done safely.

Who should review subcontractor RAMS?

Someone competent in the activity, usually the site manager with support from a health and safety adviser.

Can you review RAMS for us?

Yes. Our health and safety consultants review RAMS for contractors across the North West and North Wales.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.