Free template · Health and safety

Construction Health and Safety Audit Checklist

A free checklist for auditing a construction site. It covers the management documents, site conditions, health and welfare, with an action log and sign off.

Free to download, no sign up. White labelled so you can add your own company name and logo.

Need help using it?0151 332 6581info@matthewsroberts.com

Preview of the Health and safety audit checklist

About this template

What the Health and safety audit checklist is for

An audit goes further than an inspection. It checks that the systems behind the site are working, from the Construction Phase Plan to permits and temporary works.

This checklist follows the order an auditor works through a site and ends with a prioritised action log.

What is included

  • Project, Principal Contractor and auditor details
  • Documents and management checks
  • Site condition checks
  • Health and welfare checks
  • Action log with priority, owner and due date
  • Sign off for the auditor and site manager

How to use it

Using the Health and safety audit checklist on your project

  1. 01

    Review the documents

    Start with the Construction Phase Plan, inductions, RAMS and permits.

  2. 02

    Walk the site

    Check conditions against the plan and the controls in the RAMS.

  3. 03

    Record findings

    Log each finding with a priority, owner and date.

  4. 04

    Close out

    Follow up actions and record when they are closed.

Avoid these

Common mistakes we see on site

  • Auditing conditions without checking the paperwork
  • Findings with no owner or date
  • Actions never followed up
  • The same issues found at every audit

Prefer us to handle it?

We can run this for you on site

Matthews & Roberts provides the people behind these templates: Temporary Works Coordinators, quantity surveyors, project managers and health and safety consultants across Liverpool, Manchester, the North West and North Wales.

Send us a message
Insights
View all insights

FAQ

Construction Health and Safety Audit Checklist: questions

What is a construction health and safety audit?

A structured review of how health and safety is managed on a site, covering documents, systems and site conditions.

How is an audit different from an inspection?

An inspection checks conditions on the day. An audit also checks that the systems behind them are working.

How often should a site be audited?

Many contractors audit monthly, with weekly inspections in between. Higher risk sites may need more.

Can you audit our sites?

Yes. We carry out construction health and safety audits for contractors across the North West.

Talk to us

Need support on your project?

Tell us about your site and what you need. We will come back within one working day with a clear proposal and a named consultant.

Call 0151 332 6581

Email info@matthewsroberts.com

3a Bridgwater Street, Baltic Triangle, Liverpool L1 0AR

Send us a message

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.