Temporary Works Design

Temporary Works Design Brief: What to Include

Most temporary works design problems start with a poor brief. Here is what a good one includes.

Matthews & Roberts1 min read
Temporary works design brief reviewed against site drawings
On this page
  1. What to include
  2. Common gaps
  3. Where the brief fits
  4. Temporary works design support

A temporary works design brief tells the designer what the temporary works must do, the conditions it will work in and the constraints it must meet. Most redesigns and delays trace back to a brief with missing information.

What to include

Purpose

Content
What the temporary works will support or retain and for how long

Site information

Content
Location, access, neighbouring structures, services

Ground data

Content
Site investigation results and groundwater levels

Loads

Content
Construction, plant, storage and environmental loads

Sequence

Content
Installation, use, adaptation and removal

Constraints

Content
Space, noise, vibration, interfaces with permanent works

Check category

Content
Agreed with the designer, 0 to 3 under BS 5975

Dates

Content
When the design, check and installation are needed

Common gaps

  • No ground investigation data for excavation support
  • Plant loads near excavations missed
  • Sequence that does not match how the site will build
  • Check category left until the design arrives

Where the brief fits

The brief is issued by the Temporary Works Coordinator and recorded in the temporary works register. The design is then checked at the right category before permits to load are issued.

Temporary works design support

Matthews & Roberts arranges temporary works design and independent design checks through our engineering partners in Liverpool, Manchester, Chester and North Wales. Call 0151 332 6581 or email info@matthewsroberts.com.

Frequently asked questions

What is a temporary works design brief?

The document that tells the designer what the temporary works must do, the site conditions, loads, constraints and the check category.

Who writes the design brief?

Usually the person who needs the temporary works, reviewed and issued by the Temporary Works Coordinator.

Why does the brief matter?

Missing or wrong information leads to redesign, delay or an unsafe design. A good brief gets the design right first time.

Temporary works

Related guides and templates

Temporary works procedures link together. These guides and templates cover the rest of the process.

Need support with temporary works design on your project?

More insights

View all insights