Temporary Works Design

Who Can Design Temporary Works? Designers, Checkers and Competence

Not every temporary works design needs a specialist engineer, but every design needs a competent designer and a suitable check.

Matthews & Roberts1 min read
Temporary works designer checking calculations
On this page
  1. Designers by type of work
  2. The check
  3. The contractor's role
  4. Temporary works design in the North West

Temporary works can be designed by anyone with the skills, knowledge and experience for the type and complexity of the work, but every design must be checked at the category BS 5975 sets for the risk. Simple standard solutions may be designed in house. Complex works need a specialist engineer and an independent check.

Designers by type of work

Standard solutions from published guidance

Typical designer
Competent contractor staff

Proprietary props, shoring and scaffolds

Typical designer
System supplier's engineers

Excavation support, falsework, facade retention

Typical designer
Specialist temporary works engineer

Novel or high consequence works

Typical designer
Specialist engineer with category 3 check

The check

BS 5975 sets four categories. The higher the complexity and consequence of failure, the more independent the checker must be. Our guide to design check categories explains each one. Our independent design check service arranges category 2 and 3 checks.

The contractor's role

The contractor's Temporary Works Coordinator makes sure each item has a competent designer, a clear brief, a suitable check and permits before loading.

Temporary works design in the North West

Matthews & Roberts arranges temporary works design through our engineering partners for contractors in Liverpool, Manchester, Warrington and North Wales. Call 0151 332 6581 or email info@matthewsroberts.com.

Frequently asked questions

Who can design temporary works?

A designer with the skills, knowledge and experience for the type and complexity of the temporary works. Simple standard solutions may be designed in house. Complex works need a specialist engineer.

Can a supplier design temporary works?

Yes. Proprietary system suppliers often provide designs. They still need checking at the right category and coordinating by the TWC.

Who checks temporary works designs?

A checker suitable for the category: another member of the design team for categories 0 and 1, someone outside the design team for category 2 and an independent organisation for category 3.

Temporary works

Related guides and templates

Temporary works procedures link together. These guides and templates cover the rest of the process.

Need support with temporary works design on your project?

More insights

View all insights