Temporary works design
Independent temporary works design checks at the category BS 5975 requires, arranged through our engineering partners and recorded in your register.
Based in Liverpool. Supporting contractors across the North West and North Wales.
Discuss temporary works designWhat we do
Every temporary works design should be checked. The more complex and higher risk the design, the more independent the checker must be.
We arrange checks at the right category, make sure the checker has the information they need and record the certificate before anything is loaded.
See our main temporary works design service.
What we keep on top of
What it covers
The check category set with the designer at the start.
A suitably independent checker for category 2 and 3 designs.
Design brief, ground data and loads passed to the checker.
The design check certificate recorded in the register.
Scope
Standards
The code of practice for temporary works procedures.
Categories 0 to 3 explained.
What a good design brief includes.
Need help with independent design check?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Check subcontractor RAMS before work starts.
Across the North West & North Wales
Specialist support
Free downloads
Every temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightNot every temporary works design needs a specialist engineer, but every design needs a competent designer and a suitable check.
Read insightMost temporary works design problems start with a poor brief. Here is what a good one includes.
Read insightFAQ
BS 5975 sets categories 0 to 3. Category 0 and 1 can be checked within the design team, category 2 by someone outside the design team and category 3 by an independent organisation.
The category is agreed between the designer and the Temporary Works Coordinator based on complexity and risk.
No. The temporary works should not be installed or loaded until the design has been checked.
Temporary works design
Tell us about your project and what you need. We will come back within one working day with a clear proposal and a named consultant.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.