LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
Temporary works design
Falsework and formwork designs for slabs, walls and structures, with back propping, loading sequence and independent checks.
Based in Liverpool. Supporting contractors across the North West and North Wales.
Discuss temporary works designWhat we do
Falsework and formwork carry wet concrete, construction loads and often the floors above. Failures are sudden and serious.
We arrange designs that account for pour sequence, back propping and striking. We also make sure permits to load and strike are tied to the checked design.
See our main temporary works design service.
What we keep on top of
What it covers
Props and beams designed for the pour and construction loads.
Load paths through floors below accounted for.
Concrete pressure and stability designed properly.
Striking criteria and sequence set out clearly.
Scope
Standards
The code of practice for temporary works procedures.
Categories 0 to 3 explained.
What a good design brief includes.
Need help with falsework and formwork design?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: Temporary Works Register TemplateCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
CompleteSite and Construction Management
Little Bollington, Cheshire
Free templates
Excel register with categories, checks and permits.
Competence, appointment and systems checks for a TWC.
Permit forms ready to issue on site.
Check subcontractor RAMS before work starts.
Across the North West & North Wales
Specialist support
Free downloads
Most temporary works incidents happen when items are first loaded or removed. Here is how permits to load and strike control both moments.
Read insightEvery temporary works design needs the right level of independent check. Here is what BS 5975 Categories 0 to 3 mean and how to choose between them.
Read insightMost temporary works design problems start with a poor brief. Here is what a good one includes.
Read insightFAQ
Formwork shapes the concrete. Falsework is the temporary structure that supports the formwork and loads until the permanent structure can support itself.
Yes. Falsework is often category 2 or 3 depending on complexity and risk.
Designs often use proprietary props and beams, checked against the supplier's data and site conditions.
Temporary works design
Tell us about your project and what you need. We will come back within one working day with a clear proposal and a named consultant.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.