Engineering · North Wales

Temporary Works Design
North Wales

Temporary works design and independent design checks through our engineering partners, for contractors on North Wales projects from industrial sites to coastal schemes.

Served from our Liverpool office. Deeside and the Flintshire border are around 25 miles away via the M53 and A55.

Discuss temporary works design in North Wales

0151 332 6581info@matthewsroberts.com

Temporary works design in North Wales

Temporary Works Design for North Wales projects

North Wales temporary works range from heavy propping and excavation support inside live industrial plants to cofferdams and access structures exposed to coastal weather. Each design needs to reflect the ground, the loads and the way the site will build.

We arrange temporary works design and independent checks at the right category through our engineering partners. We coordinate them through the temporary works procedure on site.

See our main temporary works design service or everything we offer in North Wales. To discuss a project call 0151 332 6581 or email info@matthewsroberts.com.

What we plan for in North Wales

  • Ground conditions and groundwater near rivers and the coast
  • Wind loading on exposed coastal and upland sites
  • Category 3 checks for complex or high risk designs
  • Interfaces with live plant and existing structures

What we provide

Temporary Works Design in North Wales: what we cover

Excavation support

Trench boxes, sheet piles and propped excavations designed from site investigation data.

Propping and needling

Temporary support for existing structures during alteration and demolition.

Falsework and formwork

Designs for concrete structures, slabs and bridge works.

Cofferdams

Temporary works for drainage outfalls, river and coastal structures.

Planning a project in North Wales?

Speak to a consultant today. We reply to every enquiry within one working day.

Free download: Temporary Works Register Template

Case studies

View all 5 projects

Free templates

Free templates for this work

Insights
View all insights

FAQ

Temporary Works Design North Wales: questions

Do you provide temporary works design in North Wales?

Yes. We arrange temporary works design and independent design checks for North Wales projects through our engineering partners.

What design check category does my temporary works need?

BS 5975 sets categories 0 to 3 based on complexity and risk. Higher categories need a check by someone independent of the designer, or an independent organisation for category 3.

Can you also provide the Temporary Works Coordinator?

Yes. Our temporary works team provides coordinators in North Wales to run the procedure on site.

North Wales

Need temporary works design support in North Wales?

Tell us about the site and what you need. We will come back within one working day with a clear scope and a named consultant.

  • Excavation support
  • Propping and needling
  • Falsework and formwork
  • Cofferdams

Tell us about your project

Or call 0151 332 6581 or email info@matthewsroberts.com

We use your details only to reply to your enquiry.