Building Regulations in Wales: What Contractors Need to Know

Building regulations in Wales are set by the Welsh Government. Here is what changes for contractors and developers working over the border.

Matthews & Roberts2 min read
New homes built to Welsh building regulations
On this page
  1. Who sets the rules
  2. Differences that most often affect projects
  3. What stays the same
  4. Practical steps for contractors
  5. Support in North Wales

Building regulations in Wales are set by the Welsh Government, not Westminster, so contractors and developers working in North Wales should design and build to the Welsh Approved Documents rather than assuming the English versions apply. Much is similar, but the differences can change design, cost and programme.

Who sets the rules

Responsibility for building regulations in Wales passed to the Welsh Government. Since then Wales has updated several parts on its own timetable, so the Welsh and English Approved Documents are no longer identical. Always check you are working from the current Welsh version.

Differences that most often affect projects

Sprinklers in new and converted homes

Wales requires automatic fire suppression systems in new and converted homes. On residential schemes this affects water supply design, plant space, procurement and programme. Build it into the development appraisal and design management plan from the start.

Energy performance

Wales sets its own Part L requirements. Fabric and services designs prepared for England should be checked against the Welsh Approved Document before submission.

Sustainable drainage

Drainage approval sits alongside building regulations. New developments above a set size need SuDS Approving Body consent before construction starts.

What stays the same

  • CDM 2015 applies in Wales exactly as in England. See our CDM advisors in North Wales.
  • Health and safety law and HSE enforcement are the same.
  • The Construction Act payment rules apply in England and Wales.
  • BS 5975 temporary works practice is used across Great Britain. See temporary works in North Wales.

Practical steps for contractors

  1. 1Confirm which Approved Documents apply at design stage.
  2. 2Check sprinkler, energy and drainage requirements before pricing.
  3. 3Plan building control submissions and inspections into the programme.
  4. 4Keep records that show compliance for handover.

Support in North Wales

Matthews & Roberts supports contractors and developers across North Wales with construction project management, design management and development management. Call 0151 332 6581 or email info@matthewsroberts.com.

This article is general guidance. Check current Welsh Government guidance and the Approved Documents for your project.

Frequently asked questions

Are building regulations different in Wales?

Yes. Building regulations in Wales are made by the Welsh Government and Wales publishes its own Approved Documents. Some requirements, such as energy performance and sprinklers in new homes, differ from England.

Do new homes in Wales need sprinklers?

Yes. Automatic fire suppression systems are required in new and converted homes in Wales.

Does CDM 2015 apply in Wales?

Yes. CDM 2015 applies across Great Britain, including Wales. HSE enforces it on construction sites.

Development

Related guides and templates

Development decisions overlap. These cover the related planning and land questions.

Need support with design management on your project?

More insights

View all insights