Construction Management

Pharmaron Alpha Gene Therapy Facility, Liverpool: Construction Management

Construction management of civil works on Project Alpha, the expansion of Pharmaron's gene therapy development and manufacturing site in Speke, Liverpool, alongside a live pharmaceutical facility.

Speke, LiverpoolComplete2023
Steel frame of a large facility under construction

Representative image

Key facts

Our role
Construction Management
Status
Complete
Dates
2023
Value
£100m to £250m
On this page
  1. The Appointment
  2. Overview
  3. Construction Management Scope
  4. Key Interfaces Managed
  5. Approach
  6. Outcome

The Appointment

A construction management appointment for the civil works on Project Alpha in Speke, Liverpool. The role covered reinforced concrete foundations, walls and slabs, drainage and external civils, delivered beside an operational pharmaceutical facility. See our construction project management in Liverpool service.

Overview

Project Alpha expanded Pharmaron's gene therapy contract development and manufacturing site in Speke, Liverpool, adding more than 8,000 m² of capacity for viral vector, DNA and RNA development and GMP related manufacturing. Construction started in January 2023 alongside the operational laboratories and manufacturing areas on the site.

Construction Management Scope

Civil and structural works

Management of reinforced concrete foundations, walls and slabs, drainage and external civils.

Interfaces with the live facility

Coordination of civil, steel, MEP and utility interfaces next to an operational pharmaceutical facility, with permit compliance throughout.

Quality assurance

Management of inspection and test plans, reinforcement and concrete inspections and QA sign offs.

Design queries

Resolution of design queries with the design team so that works on site progressed without delay.

Key Interfaces Managed

Working beside a live pharmaceutical facility

Every activity that could affect the neighbouring laboratories and manufacturing areas was planned with the site operator and controlled through the site permit system.

Civil, steel, MEP and utility packages

Foundations, slabs and drainage were coordinated with the steel frame, MEP installation and utility connections so each package could follow on without rework.

Quality records as the work progressed

Inspection and test plans, reinforcement checks and concrete inspections were signed off at each hold point rather than assembled at the end.

Approach

The live facility next door set the rules. Every activity that could affect it was planned with the site operator, permits were followed without exception and quality records were completed as the work progressed rather than at the end.

Outcome

The civil works were delivered as part of the Project Alpha expansion, supporting new gene therapy development and manufacturing capacity in Liverpool.

Matthews & Roberts provides project management and quality assurance on industrial and life sciences projects in Liverpool and across the North West. See our industrial and manufacturing work.

Frequently asked questions

What makes construction next to a live pharmaceutical facility challenging?

Neighbouring laboratories and manufacturing areas must keep operating. Dust, vibration, access and utilities all need careful control so that construction never compromises the live facility or its regulated environment.

What are inspection and test plans?

Inspection and test plans set out every check, test and hold point for a package of work. Each item is completed and signed off before the next stage starts, giving a documented record of quality.

Contract administration

Guides and templates for this kind of work

Notices, programme and change all affect each other. These cover the related steps.

Services on this project

More projects

View all projects

Planning a similar project?

Speak to our team