Principal Contractor Checklist: The First Week on Site

The first week on site sets the standard for the whole construction phase. This checklist covers what a Principal Contractor should have in place under CDM 2015 before and during that first week.

Matthews & Roberts2 min read
New construction site being set up by a Principal Contractor
On this page
  1. Before work starts
  2. During the first week
  3. Keeping it going

The first week on a new site sets the standard for everything that follows. Under CDM 2015 the Principal Contractor must plan, manage, monitor and coordinate the construction phase. Most of that planning needs to be complete before the first operative arrives.

Use this checklist to confirm the essentials are in place.

Before work starts

  • Written appointment as Principal Contractor received from the client
  • Preconstruction information reviewed and gaps raised with the client and Principal Designer
  • Construction Phase Plan drawn up and specific to the project
  • F10 notification displayed on site where the project is notifiable
  • Welfare facilities to Schedule 2 in place and working
  • Site boundary secure with measures to prevent unauthorised access
  • Traffic routes, pedestrian routes and delivery arrangements set out
  • Emergency procedures, first aid and fire arrangements agreed
  • Temporary Works Coordinator appointed where temporary works are planned

During the first week

  • Every worker inducted before starting work, with records kept
  • Site rules issued and displayed
  • RAMS for each starting package reviewed against the work planned
  • Permit to work arrangements live for high risk activities
  • First coordination meeting held with every contractor on site
  • Arrangements in place to consult and engage with workers
  • First inspection completed with actions recorded and assigned

Keeping it going

  • Construction Phase Plan reviewed as the sequence and subcontractors change
  • Inspections and audits scheduled with actions tracked to close
  • Information for the Health and Safety File gathered as work progresses
  • Regular liaison with the Principal Designer on design changes and residual risks

For the full explanation of the duties, read our guide to Principal Contractor duties under CDM 2015 and our guide to the Construction Phase Plan. If temporary works are planned, use our TWC appointment checklist.

Matthews & Roberts provides Principal Contractor support and construction health and safety consultants to contractors across Liverpool, Manchester, Chester and the North West. Get in touch before your next site starts.

Frequently asked questions

Must the Construction Phase Plan be in place before work starts?

Yes. Under CDM 2015 the Principal Contractor must draw up the Construction Phase Plan before the construction phase begins and the client must make sure it is in place before work starts.

What welfare must be provided from day one?

Schedule 2 of CDM 2015 sets the minimum: sanitary conveniences, washing facilities, drinking water, changing rooms, lockers and facilities for rest. They should be available from the start of the construction phase.

Can Matthews & Roberts help set up a new site?

Yes. We support Principal Contractors across the North West with Construction Phase Plans, site rules, inductions, RAMS review and inspections from mobilisation onwards.

CDM and site safety

Related guides and templates

CDM duties connect from planning to handover. These cover the related documents and checks.

Need support with principal contractor support on your project?

More insights

View all insights
CDM Advisory

Principal Contractor Duties Under CDM 2015: A Practical Guide

The Principal Contractor controls health and safety during the construction phase of any project with more than one contractor. This guide explains when a Principal Contractor is required, what CDM 2015 says they must do and how those duties translate into day to day site management.

Read insight