What Happens in a Construction Health and Safety Audit?

A construction health and safety audit tests whether your system works on the ground. Here is what auditors check, how the day runs and how to prepare.

Matthews & Roberts2 min read
Construction health and safety audit on an infrastructure site
On this page
  1. Audit or inspection?
  2. How the day runs
  3. What auditors look for
  4. How to prepare
  5. Audits and accreditation
  6. Audits across the North West

A construction health and safety audit tests whether your management system works on the ground. An inspection looks at conditions on the day. An audit asks why those conditions exist: whether planning, competence, documents and supervision add up to safe work every day.

Audit or inspection?

Focus

Inspection
Site conditions
Audit
The system behind the site

Frequency

Inspection
Weekly or fortnightly
Audit
At key stages or annually

Evidence

Inspection
What is seen on the day
Audit
Documents, records, interviews and site

Output

Inspection
Snag list of actions
Audit
Findings on root causes and controls

Both matter. Our site safety inspections and construction health and safety audits are often combined in one retainer.

How the day runs

  1. 1Scope agreed in advance, including the site, the activities and any focus areas
  2. 2Opening meeting with the site manager
  3. 3Document review of the Construction Phase Plan, RAMS, permits, inspection registers and training records
  4. 4Site walk covering access, work at height, lifting, excavations, temporary works, traffic routes and welfare
  5. 5Conversations with supervisors and operatives about how the work is really done
  6. 6Closing meeting with headline findings so urgent issues are fixed straight away

What auditors look for

  • RAMS that match the work actually happening
  • Permits that are live, signed and understood
  • Scaffold, excavation and lifting equipment inspections up to date
  • Temporary works registered and checked under BS 5975
  • Inductions and competence cards checked for everyone on site
  • Actions from previous inspections closed with evidence

How to prepare

Keep registers current every week rather than the night before. Brief supervisors so they can explain their own controls. Fix known issues before the audit, not during it. Ask for the audit criteria in advance so nothing comes as a surprise.

Audits and accreditation

An internal audit is a requirement of ISO 45001. A gap audit is the fastest way to prepare for CHAS, SafeContractor or Constructionline. See which accreditations contractors need.

Audits across the North West

Matthews & Roberts carries out construction health and safety audits for contractors in Liverpool, Manchester, St Helens, the Wirral and across the North West. Read our guide to construction site health and safety inspections for the legal background.

Frequently asked questions

What is checked in a construction health and safety audit?

Auditors check documents such as the Construction Phase Plan, RAMS, permits and training records, then walk the site to see whether practice matches the paperwork. They also talk to supervisors and operatives.

How long does a site health and safety audit take?

A single site audit usually takes from half a day to a full day, depending on the size of the site and the scope. A company wide system audit takes longer.

What happens after the audit?

You receive a report with findings ranked by risk, each with an owner and a target date. A good audit includes a follow up to confirm the actions have been closed.

CDM and site safety

Related guides and templates

CDM duties connect from planning to handover. These cover the related documents and checks.

Need support with health & safety on your project?

More insights

View all insights