Electrical and mechanical contractors must control live systems, stored energy, hot works and heavy plant on top of the usual construction risks. The Electricity at Work Regulations 1989, CDM 2015 and a set of equipment specific regulations all apply.
The legal framework
- Health and Safety at Work etc. Act 1974 sets the general duties
- CDM 2015 governs planning and management of the construction work
- Electricity at Work Regulations 1989 cover all work on or near electrical systems
- Pressure Systems Safety Regulations 2000 apply to systems containing pressurised fluids
- Gas Safety (Installation and Use) Regulations 1998 require gas work to be done by Gas Safe registered businesses
- LOLER 1998 and PUWER 1998 cover lifting and work equipment
Safe isolation
Dead working is the default. The Electricity at Work Regulations 1989 only allow live work where it is unreasonable for the system to be dead, reasonable to work live and suitable precautions are taken. A safe isolation procedure should identify the circuit, isolate, lock off, prove dead with a tested voltage indicator and keep the isolation under control until the work is complete. HSE guidance HSG85 covers safe working practices.
Permits to work
Permits control isolations, hot works, confined spaces and work on pressure systems. They only work if they match how systems are actually energised and who can change their status. Each isolation should have a named competent person.
Hot works
Brazing, welding and cutting need a hot works permit, combustibles cleared or protected, extinguishers at hand and a fire watch during and after the work.
Testing and commissioning
Commissioning is where many M&E incidents happen. Systems go live while other trades are still working nearby. An energisation plan, clear labelling of live and dead systems and agreed handover points keep everyone informed.
Plant, risers and plant rooms
Lifting chillers, generators and air handling units needs planned lifts. Risers and plant rooms bring confined working, falls through openings and manual handling risks.
Support for M&E contractors
Matthews & Roberts provides electrical and mechanical health and safety support for M&E contractors across Liverpool, Manchester, Chester and the North West. See our North Wales manufacturing commissioning assurance and Pharmaron Alpha Liverpool case studies. Read our guide to health and safety on live industrial sites in Cheshire.
Frequently asked questions
Can electricians work on live systems?
Only in strictly limited circumstances. The Electricity at Work Regulations 1989 allow live work only where it is unreasonable for the system to be dead, reasonable to work live and suitable precautions are in place. Dead working is the default.
What is a safe isolation procedure?
A written procedure to identify the circuit, isolate it, lock it off, prove it dead with a tested voltage indicator and control the isolation until the work is finished.
Do mechanical contractors need permits for hot works?
Hot works such as brazing, welding and cutting should be controlled by a permit with fire precautions, a fire watch during and after the work and checks before the area is left.
Health and safety support
Related guides and templates
Choosing the right level of support starts with knowing what you need. These help.
Guides
- Do I Need a Health and Safety Consultant for Construction Work?Every employer must have competent health and safety help. Whether that means an in house manager or an external...
- What Are the Main Health and Safety Risks on High Rise Construction?High rise construction repeats its biggest risks on every floor. Here are the hazards that matter most on tall...
- What Health and Safety Rules Apply on a Housing Development Site?Housing sites change every week and bring the public close to live construction. Here are the rules that apply and...
- What Health and Safety Requirements Apply to Rail and Civil Engineering Projects?Rail and civil engineering projects combine CDM 2015 with asset owner rules, heavy plant and buried services. Here...
Free templates
- Construction Site Safety Inspection ChecklistA structured weekly site safety inspection.Free · Word and PDF
- RAMS Review ChecklistCheck subcontractor RAMS before work starts.Free · Word and PDF
- Construction Health and Safety Audit ChecklistDocuments, site conditions and welfare with an action log.Free · Word and PDF
Need support with health & safety on your project?