Housing development sites must meet CDM 2015 in full, from the first day of groundworks to the last handover. The risks change as the site moves from roads and drainage to plots, scaffolds and roofs, then to occupied phases where residents live next to live construction.
The legal framework
CDM 2015 applies to every housing site. Where more than one contractor is involved the client must appoint a Principal Designer and a Principal Contractor. The Principal Contractor must prepare a Construction Phase Plan before work starts. The Work at Height Regulations 2005, LOLER 1998 and PUWER 1998 apply to the work itself.
Traffic management
Vehicles and plant are a leading cause of serious injuries on housing sites. A traffic management plan should separate pedestrians from plant, set one way routes and turning areas, control reversing and plan deliveries. It must be updated as roads, plots and compounds change.
Scaffolds and roofing
Each plot goes through scaffolding, roofing and often loft work. Scaffolds need inspection before first use and at least every seven days, plus after any event that could affect stability. Roof edges, openings and fragile materials need protection before trades start.
Excavations and services
Drainage, attenuation and utility connections mean many open excavations. Each needs support or battering, safe access, edge protection and inspection at the start of every shift. Service avoidance should follow HSG47.
Protecting the public and residents
Housing sites attract children and passers by. Secure hoarding, locked plant and good housekeeping matter, especially out of hours. Once homes are occupied the boundary between residents and construction becomes the critical control. HSG151 covers protecting the public.
Welfare
Toilets, washing facilities, drinking water, changing areas and a warm place to rest must be in place from the start and kept clean throughout.
Housing site support across the North West
Matthews & Roberts provides housing site health and safety support for housebuilders and contractors across the North West, including Wigan, Warrington, St Helens and Preston. See our Lakeside Development case study and our housing and residential sector page.
Frequently asked questions
Does CDM 2015 apply to housing developments?
Yes. CDM 2015 applies to all construction work, including housing. Where more than one contractor is involved, which is almost always the case on a housing site, the client must appoint a Principal Designer and a Principal Contractor.
What welfare is required on a housing site?
CDM 2015 requires suitable toilets, washing facilities, drinking water, changing and storage areas and rest facilities from the start of the work until the end.
How should a site keep residents safe once homes are occupied?
With secure physical separation between occupied areas and live construction, separate access routes, planned delivery times and regular checks that the boundary is intact.
Health and safety support
Related guides and templates
Choosing the right level of support starts with knowing what you need. These help.
Guides
- Do I Need a Health and Safety Consultant for Construction Work?Every employer must have competent health and safety help. Whether that means an in house manager or an external...
- What Health and Safety Requirements Apply to Rail and Civil Engineering Projects?Rail and civil engineering projects combine CDM 2015 with asset owner rules, heavy plant and buried services. Here...
- Health and Safety on Live Industrial Sites in Cheshire, Widnes and RuncornConstruction on an operating industrial site means working inside the client's rules as well as your own. This guide...
- Data Centre Construction: Managing Risk in a High Growth SectorThe UK data centre market continues to expand rapidly. We explore the unique health and safety challenges these...
Free templates
- Construction Site Safety Inspection ChecklistA structured weekly site safety inspection.Free · Word and PDF
- RAMS Review ChecklistCheck subcontractor RAMS before work starts.Free · Word and PDF
- Construction Health and Safety Audit ChecklistDocuments, site conditions and welfare with an action log.Free · Word and PDF
Need support with health & safety on your project?