Rail and civil engineering projects must meet CDM 2015 and the asset owner's own safety rules at the same time. Heavy plant, deep excavations, buried services and live traffic or trains make the hazards severe, so planning and competence carry more weight than on most building sites.
CDM 2015 on infrastructure
CDM 2015 applies to civil engineering and rail work in the same way as building work. Clients appoint a Principal Designer and Principal Contractor where more than one contractor is involved. The Construction Phase Plan must reflect the specific hazards of the scheme, including the interface with the operational asset.
Excavations
CDM 2015 requires excavations to be prevented from collapsing, protected against falls of people, materials and vehicles. They must be inspected by a competent person at the start of each shift. Deep excavations near structures or roads usually need designed temporary works. See our temporary works coordination service.
Buried services
Service strikes injure workers every year. HSG47 sets out the approach: plan the work using service records, locate and mark services with detection equipment, then dig with safe methods near known services. A permit to dig system makes sure each step happens.
Plant and people
Excavators, dumpers and rollers cause many serious injuries on civil engineering sites. Exclusion zones, segregation, trained plant operators, banksmen and controls on lifting with excavators reduce the risk.
Rail specific requirements
- Sentinel records the rail competences of people working on Network Rail managed infrastructure
- PTS (Personal Track Safety) is the core competence for working on or near the line
- RISQS is the supplier qualification scheme many rail clients use to approve contractors
- Possessions and access are planned through the infrastructure manager's own processes
Station and platform works add passengers and operational staff to the picture, so segregation and communication with the station operator are essential.
Highways and utilities
Work on highways needs traffic management to the relevant code of practice and a permit from the highway authority. Water and utility sites have their own permit systems and site rules that sit alongside CDM 2015.
Support for infrastructure contractors
Matthews & Roberts provides civil engineering health and safety and rail construction health and safety support from our Liverpool office. See the Tatton Services M56 case study and the Northern Rail platform validator programme. We support contractors in Warrington, Widnes and Runcorn, Chester and across the North West.
Frequently asked questions
What is PTS in rail?
PTS stands for Personal Track Safety. It is the core competence that allows a person to work on or near the line on Network Rail managed infrastructure. Competences are recorded through the Sentinel scheme.
What is the most common cause of service strikes?
Poor planning and failing to locate services before digging. HSE guidance HSG47 sets out a three step approach: plan the work, locate and identify services, then use safe digging methods.
Do infrastructure clients have their own safety rules?
Yes. Network Rail, highways authorities and water companies all have their own standards, permits and access rules that apply alongside CDM 2015.
Health and safety support
Related guides and templates
Choosing the right level of support starts with knowing what you need. These help.
Guides
- Do I Need a Health and Safety Consultant for Construction Work?Every employer must have competent health and safety help. Whether that means an in house manager or an external...
- Health and Safety on Live Industrial Sites in Cheshire, Widnes and RuncornConstruction on an operating industrial site means working inside the client's rules as well as your own. This guide...
- Data Centre Construction: Managing Risk in a High Growth SectorThe UK data centre market continues to expand rapidly. We explore the unique health and safety challenges these...
- How Much Does a Construction Health and Safety Consultant Cost?There is no single price for construction health and safety support. Here is how consultants usually charge, what...
Free templates
- Construction Site Safety Inspection ChecklistA structured weekly site safety inspection.Free · Word and PDF
- RAMS Review ChecklistCheck subcontractor RAMS before work starts.Free · Word and PDF
- Construction Health and Safety Audit ChecklistDocuments, site conditions and welfare with an action log.Free · Word and PDF
Need support with health & safety on your project?