LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
External construction health and safety adviser
Health and safety support for contractors on high rise residential and commercial towers, where work at height, lifting and logistics drive the risk.
Based in Liverpool. Supporting high rise schemes across Manchester, Salford, Liverpool and the North West.
Discuss a retained H&S adviserWhat we do
Tall buildings concentrate risk. Every floor cycle repeats edge protection, falsework, crane lifts and hoist movements, often on a tight city centre plot with the public at the hoarding line.
We help contractors plan and control those risks, working alongside the temporary works coordinator and the Principal Contractor's site team.
See our main health & safety service.
What we keep on top of
What it covers
Edge protection, screens, openings and leading edge controls through each floor cycle.
Lift plans, crane and hoist coordination and checks under LOLER 1998.
Exclusion zones, netting, fans and controls at the site boundary.
Deliveries, vertical access, emergency routes and fire safety during construction.
Scope
Regulations
The general duties of employers to their employees and others affected by their work.
Duties on contractors and the Principal Contractor to plan, manage and monitor construction work.
Risk assessment and the duty to appoint competent health and safety assistance.
Planning and inspection of work at height and lifting operations.
Legal duties remain with the contractor and, where appointed, the Principal Contractor.
Need help with high rise construction health and safety?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: RAMS Review ChecklistCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
CompleteProject Management and Health & Safety Management
Lake District
LiveTemporary Works Coordination and Consultancy
Chester, Cheshire
Free templates
Check subcontractor RAMS before work starts.
A structured weekly site safety inspection.
A CDM 2015 plan ready to make site specific.
Task sequence, risks, controls and briefing record.
Across the North West & North Wales
Specialist support
Free downloads
High rise construction repeats its biggest risks on every floor. Here are the hazards that matter most on tall buildings and the controls contractors rely on.
Read insightHigh rise frames in Manchester and Salford carry a long list of temporary works that move with the floor cycle. This guide covers what a Temporary Works Coordinator should control on tower projects.
Read insightSite inspections are how contractors find out whether their health and safety arrangements are working. This guide separates the inspections the law requires from the monitoring a Principal Contractor should carry out. It also explains what a good construction site inspection covers.
Read insightFAQ
Falls from height, falling objects, lifting operations, fire during construction and congestion around vertical access and deliveries.
Higher risk buildings in England have extra duties under the Building Safety Act 2022, including gateway approvals from the Building Safety Regulator. CDM 2015 still governs health and safety during construction.
Yes. Falsework, back propping, crane bases and edge protection are temporary works, so we coordinate closely with the temporary works coordinator on high rise schemes.
Health and safety
Tell us about your sites and the support you need. We will come back to you with a clear proposal for a retainer or a defined project scope.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.