LiveTemporary Works Consultancy and Health & Safety Support
Tatton Services, M56: Temporary Works and Health & Safety
M56, Cheshire, North West
External construction health and safety adviser
Health and safety support for civil engineering and infrastructure contractors working on highways, utilities, drainage and water treatment schemes.
Based in Liverpool. Supporting infrastructure contractors across the North West and the UK.
Discuss a retained H&S adviserWhat we do
Civil engineering work brings heavy plant, deep excavations, buried services and live traffic together, often on sites that stretch for miles.
We help civil engineering and infrastructure contractors plan and control that work, from excavation permits to plant and people segregation.
See our main health & safety service.
What we keep on top of
What it covers
Support, inspection and safe access for trenches and deep excavations.
Service avoidance using HSG47, permits to dig and safe digging practice.
Exclusion zones, banksmen, lifting with excavators and segregation.
Highways, water treatment works and operational sites with client rules.
Scope
Regulations
The general duties of employers to their employees and others affected by their work.
Duties on contractors and the Principal Contractor to plan, manage and monitor construction work.
Risk assessment and the duty to appoint competent health and safety assistance.
Planning and inspection of work at height and lifting operations.
Legal duties remain with the contractor and, where appointed, the Principal Contractor.
Need help with civil engineering health and safety?
Speak to a consultant today. We reply to every enquiry within one working day.
Free download: RAMS Review ChecklistCase studies
LiveTemporary Works Consultancy and Health & Safety Support
M56, Cheshire, North West
CompleteConstruction Management and Quality Assurance
Redmain, Cumbria
CompleteProject Management and Health & Safety Management
Lake District
Free templates
Check subcontractor RAMS before work starts.
A structured weekly site safety inspection.
A CDM 2015 plan ready to make site specific.
Task sequence, risks, controls and briefing record.
Across the North West & North Wales
Specialist support
Free downloads
Rail and civil engineering projects combine CDM 2015 with asset owner rules, heavy plant and buried services. Here are the requirements contractors need to plan for.
Read insightSite inspections are how contractors find out whether their health and safety arrangements are working. This guide separates the inspections the law requires from the monitoring a Principal Contractor should carry out. It also explains what a good construction site inspection covers.
Read insightReviewing subcontractor RAMS is one of the main ways a Principal Contractor controls the construction phase. This guide explains who is responsible for a RAMS review, what a competent reviewer should check and how to run the process without holding up the programme.
Read insightFAQ
CDM 2015 requires excavations to be prevented from collapsing, inspected by a competent person and kept free of risks from falls and buried services. Inspections are required at the start of each shift.
By following HSG47: plan the work, use service drawings, locate services with detection equipment and dig with safe methods near known services.
Yes. We support contractors on operational treatment works and utility sites where the asset owner's rules apply alongside CDM 2015.
Health and safety
Tell us about your sites and the support you need. We will come back to you with a clear proposal for a retainer or a defined project scope.
The Client Portal provides secure access to project documents, progress updates and direct communication with your Matthews & Roberts team.
Request access: info@matthewsroberts.com
Portal access is provided to approved clients. Contact us if you need support.

Access your project portal to view documents and track progress.
Tell us about your project and we'll respond within 24 hours.